<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>bd EnergY  LinK &#187; Article</title>
	<atom:link href="http://www.bdelink.com/index.php/category/energy-power-sector/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.bdelink.com</link>
	<description>Bangladesh Energy News... Info Links</description>
	<lastBuildDate>Mon, 06 Sep 2010 01:02:30 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Bangladesh govt yet to allow sale of gas to pvt buyers</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F08%2F11%2Fbangladesh-govt-yet-to-allow-sale-of-gas-to-pvt-buyers%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F08%2F11%2Fbangladesh-govt-yet-to-allow-sale-of-gas-to-pvt-buyers%2F#comments</comments>
		<pubDate>Thu, 12 Aug 2010 05:17:14 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[News Link]]></category>
		<category><![CDATA[english]]></category>
		<category><![CDATA[bangladesh enegry news]]></category>
		<category><![CDATA[gas]]></category>
		<category><![CDATA[Investment]]></category>
		<category><![CDATA[power]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2978</guid>
		<description><![CDATA[ Govt yet to allow sale of gas to pvt buyers
Cairn drops exploration in new offshore structures

M Azizur Rahman
Scottish Cairn Energy has dropped its planned exploration in new offshore structures in Magnama and Hatiya in the Bay of Bengal this year as the government is yet to allow it to sell gas at market prices [...]]]></description>
			<content:encoded><![CDATA[<p><strong> Govt yet to allow sale of gas to pvt buyers<br />
Cairn drops exploration in new offshore structures</strong><br />
<img src="http://www.bdelink.com/wp-content/uploads/2010/04/fe-logo4.bmp" alt="কয়লা" title="fe logo" class="alignright size-full wp-image-2394" /><br />
<strong>M Azizur Rahman</strong></p>
<p>Scottish Cairn Energy has dropped its planned exploration in new offshore structures in Magnama and Hatiya in the Bay of Bengal this year as the government is yet to allow it to sell gas at market prices to private buyers.</p>
<p>The move comes as a big blow to the country&#8217;s future gas supply situation as the state-owned distribution giant Petrobangla has been struggling to meet soaring demand in factories and power plants.</p>
<p>The country now runs supply shortfall of 500 million cubic feet of gas a day (mmcfd) &#8211; around 25 per cent of the total output of 2,000 mmcfd &#8211; which has resulted in shutdown of scores of industrial units and power plants.</p>
<p>&#8220;We have been waiting for a positive reply from Petrobangla on our proposals,&#8221; a company insider said.</p>
<p>&#8220;With Petrobangla failing to approve the proposals, we have now decided to drop our planned explorations in new offshore structures in the coming winter,&#8221; he said.</p>
<p>Cairn a couple of months ago requested the government to amend the existing production sharing contract (PSC) terms and allow it to sell gas at freshly negotiated prices to third parties, a senior energy ministry official told the FE</p>
<p>Under the existing PSC, the Cairn has to sell all its gas to state-owned Petrobangla at a maximum price of $2.90 per Mcf (1,000 cubic feet). Petrobangla then distributes the gas to end users.</p>
<p>In case Petrobangla refuses to lift the gas, the operators can sell directly to third parties, but at the fixed price of $2.90 per Mcf.</p>
<p>Cairn now believes that it can get a higher price for their gas given that most potential buyers are using more expensive oil to run their plants amid the ongoing acute gas shortage.</p>
<p>Company officials said Cairn had asked Petrobangla to respond by July 11, as it needed enough time to initiate drilling in the coming winter.</p>
<p>&#8220;If the government decision over Cairn&#8217;s proposal would come even within July it would have been possible by the company to conduct hydrocarbon exploration in the Bay,&#8221; the company insider said.</p>
<p>Officials said a delay in gas extraction from the two Cairn operated structures would be a big setback for the country&#8217;s future gas supply scenario.</p>
<p>The Petrobangla has expected that gas output from the two fields would mitigate the supply crunch in and around the Chittagong region, the country&#8217;s main economic hub, within the next four years.</p>
<p>As per its planned exploration activities, Cairn was to conduct drilling wells in South Sangu, Magnama and Hatiya to develop the fields for natural gas production.</p>
<p>It last year conducted extensive three-dimensional seismic surveys in these structures and encountered gas presence there. It, however, did not disclose the size of the reserve.</p>
<p>Magnama and Hatiya structures are located in Bangladesh&#8217;s shallow offshore gas block No 16 and were awarded to Cairn Energy following the country&#8217;s first round of bidding for oil and gas exploration in 1994.</p>
<p>A PSC was subsequently signed between the company and Petrobangla for exploring the block.</p>
<p>But due to limited local gas market and a bar on export, Cairn did not go for exploring these fields until 2005. Instead, it extended the exploration deadline several times.</p>
<p>With the local fuel demand growing over 10 per cent a year since 2003, the company is now interested to pour in millions of dollars in new exploration in the two structures.</p>
<p>Cairn now operates the country&#8217;s only offshore gas field Sangu some 20 kilometres off the Chittagong seashore.</p>
<p>Gas production from Sangu slumped to 28 (mmcfd) Wednesday from its average production of 180 mmcfd during 2006, hitting the supply situation across Chittagong.</p>
<p>Cairn is selling gas to Petrobangla at about $2.9 per unit from Sangu field.</p>
<p>Cairn and Australia&#8217;s Santos have a 37.5 per cent stake each in Magnama and Hatiya structures which lie close to the Sangu field.</p>
<p>The remaining 25 per cent stake in the two structures is owned by US-based Halliburton Energy. </p>
<p><strong> Enticing investments in power sector</strong><br />
News Analysis</p>
<p><strong>Shahiduzzaman Khan</strong></p>
<p>Since taking over office, Prime Minister Sheikh Hasina met the power and energy officials for the third time so far including the one held this week and expressed her resentment over &#8217;slow&#8217; pace of project works in the ailing sector. She asked the officials to intensify drive for implementing the power and energy sector projects in time. She said the existing policies and rules can be amended, if necessary, to pave the way for quick implementation of projects in the sector.</p>
<p>According to reports this week, the Prime Minister told the authorities to encourage local private entrepreneurs to invest in the country&#8217;s ailing power and energy sector. Many local firms are showing interest to invest in power and energy sector. Summit, Energypac, ITC Group etc., are some of them. If attracted, local private investments would help prevent the flight of foreign currencies in the form of profit repatriation, it is expected.</p>
<p>Meanwhile, the power supply crisis has badly affected the lives of the people. The economy has been forced to pay a heavy toll. The supply-side situation has meanwhile continued to remain in a critical shape in the context of the backlog of a huge demand-supply gap and also of fast-growing domestic demand. The output of gas and electricity did not increase much in the past seven years. The present government has finalised a road-map to generate around 9,426 megawatt (mw) of electricity by 2015. Some 571 mw of electricity could be added to the national grid during the past one and a half years, according to reports. The demand for growth of electricity is outpacing the additional generation. At present, the power generation capacity is over 5,000 mw, but the everyday actual generation stands at 3800-4100 mw due to technical glitches and gas crisis.</p>
<p>Reports say the Power Division is now devising ways and means to attract capital from both external and domestic sources for investment in the next two decades. Ensuring reasonable and affordable price for electricity by pursuing least cost options, making the power sector financially viable and having a mix of concessional capital and foreign direct investment (FDI) are among the reforms the Power Division is undergoing with a view to enticing power sector investments. A number of road shows were organised both at home and abroad in recent months to attract investments, particularly foreign ones, to the power sector.</p>
<p>Finance Minister AMA Muhith recently said that the funds for implementing power and energy projects would not be a problem as the sector was on top of the government agenda. He just wanted a firm commitment from the stakeholders &#8212; both public and private &#8212; for coming out of the current &#8216;catastrophic&#8217; power and energy crunch. The government is exploring all sorts of alternatives to exploit the use of coal, natural gas, hydro, liquid-fuel, liquefied natural gas (LNG), liquefied petroleum gas (LPG), nuclear plants etc., to resolve the energy crisis.</p>
<p>Installing new coal-fired power plants, importing electricity from power-rich neighbouring countries and setting up nuclear power plants are among the planned avenues the Division is now considering for implementation. Exchanging electricity with the bordering countries during off-peak and peak hours and establishing joint venture power plant projects with them are also in the division&#8217;s action strategy. The potentials of renewable energy such as solar power, wind power and power generation from solid wastes are also being reportedly explored to enhance electricity generation for future needs.</p>
<p>As such, comprehensive institutional arrangements do need to be put in place for addressing the financing challenges in the urgently needed power sector investments in Bangladesh, of course with scope for further development and expansion as needs expand. For this, energy and finance ministries, Bangladesh Bank (BB) and Board of Investment (BoI) will have to work in close co-ordination to ensure flexibility and responsiveness of the available arrangements to the needs of undertakings of various sizes and types. Regular periodical contacts and consultations of these authorities with power sector entrepreneurs and the financing community will also be important in tracking and promptly addressing the needs and issues as they arise.</p>
<p>For a plan to install 7000 megawatt worth of power by the year 2014, financing worth of US$ 10 billion dollars will be required. This will be the avenue for the biggest opportunity being opened up for the private sector investment since the country&#8217;s independence. In addition, once the government gives the go-ahead for the much-awaited coal policy &#8212; the draft of which is being discussed for the last few years &#8212; the country&#8217;s coal sector would also open up multi-billion dollars worth of investment opportunities for the private sector over a long period of time.</p>
<p>Local entrepreneurs are largely of the view that ensuring public confidence will be critical to attracting investors to areas where risks have to be taken in costly ventures. If the tendering process does not appear fair, genuine bidders will gradually refrain from participating in the bids, leaving all the jobs to inept contractors who would not be able to deliver the desired results.</p>
<p>It is not that the government&#8217;s investment policy or incentive-package that alone lures foreign investors. The investors take into consideration many other factors before deciding to come to a country. Factors such as macro-economic stability, economic governance, infrastructure, costs of doing business, political stability and law and order do also figure prominently in the minds of an investor. They also take into consideration seriously the experience and the mood of the private sector of a country before making a final investment decision. szkhan@dhaka.net</p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F08%2F11%2Fbangladesh-govt-yet-to-allow-sale-of-gas-to-pvt-buyers%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>কয়লাখনি -‘উন্মুক্ত না, বিদেশি না, রপ্তানি না’: কেন?</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F08%2F02%2F%25e0%25a6%2595%25e0%25a7%259f%25e0%25a6%25b2%25e0%25a6%25be%25e0%25a6%2596%25e0%25a6%25a8%25e0%25a6%25bf-%25e2%2580%2598%25e0%25a6%2589%25e0%25a6%25a8%25e0%25a7%258d%25e0%25a6%25ae%25e0%25a7%2581%25e0%25a6%2595%25e0%25a7%258d%25e0%25a6%25a4-%25e0%25a6%25a8%25e0%25a6%25be-%25e0%25a6%25ac%25e0%25a6%25bf%25e0%25a6%25a6%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F08%2F02%2F%25e0%25a6%2595%25e0%25a7%259f%25e0%25a6%25b2%25e0%25a6%25be%25e0%25a6%2596%25e0%25a6%25a8%25e0%25a6%25bf-%25e2%2580%2598%25e0%25a6%2589%25e0%25a6%25a8%25e0%25a7%258d%25e0%25a6%25ae%25e0%25a7%2581%25e0%25a6%2595%25e0%25a7%258d%25e0%25a6%25a4-%25e0%25a6%25a8%25e0%25a6%25be-%25e0%25a6%25ac%25e0%25a6%25bf%25e0%25a6%25a6%2F#comments</comments>
		<pubDate>Tue, 03 Aug 2010 00:50:46 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[COAL]]></category>
		<category><![CDATA[bangla বাংলা]]></category>
		<category><![CDATA[জ্বালানি সংবাদ]]></category>
		<category><![CDATA[বাংলা]]></category>
		<category><![CDATA[ENVIRONMENT NEWS]]></category>
		<category><![CDATA[কয়লা খনি]]></category>
		<category><![CDATA[কয়লা]]></category>
		<category><![CDATA[কয়লাখনি]]></category>
		<category><![CDATA[জ্বালানি]]></category>
		<category><![CDATA[বড়পুকুরিয়া]]></category>
		<category><![CDATA[বাংলাদেশ এনার্জি নিউজ]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2974</guid>
		<description><![CDATA[কয়লাখনি
‘উন্মুক্ত না, বিদেশি না, রপ্তানি না’: কেন?
আনু মুহাম্মদ &#124; তারিখ: ০৩-০৮-২০১০

গত ১৪ জুন ২০১০ প্রথম আলোয় প্রকাশিত একটি লেখায় ভূতাত্ত্বিক ইউনুস আলী আকন উন্মুক্ত খনির পক্ষে জোরালো বক্তব্য দিয়েছেন। ২০ জুন সরকারি দলের প্রভাবশালী সদস্য শেখ সেলিমও এই মতের পক্ষে সংসদে বক্তব্য দিয়েছেন। কয়েক মাস ধরে সাবেক রাষ্ট্রপতি হুসেইন মুহম্মদ এরশাদ, অর্থমন্ত্রী আবুল মাল আবদুল [...]]]></description>
			<content:encoded><![CDATA[<p><strong>কয়লাখনি<br />
‘উন্মুক্ত না, বিদেশি না, রপ্তানি না’: কেন?</strong><br />
<strong>আনু মুহাম্মদ </strong>| তারিখ: ০৩-০৮-২০১০<br />
<img src="http://www.bdelink.com/wp-content/uploads/2010/08/prothom-alo.jpg" alt="" title="prothom alo" width="108" height="24" class="alignright size-full wp-image-2967" /><br />
গত ১৪ জুন ২০১০ প্রথম আলোয় প্রকাশিত একটি লেখায় ভূতাত্ত্বিক ইউনুস আলী আকন উন্মুক্ত খনির পক্ষে জোরালো বক্তব্য দিয়েছেন। ২০ জুন সরকারি দলের প্রভাবশালী সদস্য শেখ সেলিমও এই মতের পক্ষে সংসদে বক্তব্য দিয়েছেন। কয়েক মাস ধরে সাবেক রাষ্ট্রপতি হুসেইন মুহম্মদ এরশাদ, অর্থমন্ত্রী আবুল মাল আবদুল মুহিত, জ্বালানি উপদেষ্টা তৌফিক এলাহী চৌধুরী, ভূমি প্রতিমন্ত্রী মুস্তাফিজুর রহমান, পেট্রোবাংলার চেয়ারম্যান হোসেন মনসুর প্রায়ই উন্মুক্ত খনির পক্ষে বলছেন, অর্থমন্ত্রী লিখিত নোটও পাঠিয়েছেন উচ্চপর্যায়ে। তাঁদের সবার মূল যুক্তি হলো: বিদ্যুৎসংকট সমাধানের জন্য উন্মুক্ত খনি পদ্ধতিতে কয়লা উত্তোলনের কোনো বিকল্প নেই! তাঁরা অবশ্য কেউ এশিয়া এনার্জির ফুলবাড়ী কয়লা প্রকল্প নিয়ে প্রকাশ্যে কোনো কথা বলেন না। এই প্রকল্প এখনো বাতিল হয়নি এবং এশিয়া এনার্জিও (বর্তমানে জিসিএম) তৎপরতা থাকায় উন্মুক্ত খনির পক্ষে অবস্থান কার্যত এশিয়া এনার্জির ওই প্রকল্পের পক্ষে অবস্থানেরই নামান্তর। তাঁরা কখনোই বলেন না, সেই প্রকল্প অনুযায়ী শতকরা ৮০ ভাগ কয়লা যদি বিদেশেই রপ্তানি হয় তাহলে বিদ্যুৎ উৎপাদন হবে কী দিয়ে?<br />
ইউনুস আলী আকন বলেছেন, ‘যাঁরা উন্মুক্ত পদ্ধতিতে কয়লা উত্তোলনের বিরোধিতা করছেন, তাঁরা কেউ কয়লা বিশেষজ্ঞ বা খনি প্রকৌশলী নন।’ তিনি অবশ্য বলেননি, যাঁরা পক্ষে বলছেন, তাঁদের কয়জন কয়লা বিশেষজ্ঞ বা খনি প্রকৌশলী? পক্ষে বলার জন্য কি বিশেষজ্ঞ জ্ঞান দরকার হয় না?<br />
কেউ যতই পণ্ডিত হোন তিনি যদি ওই বিষয়ে কোনো কোম্পানির কর্মকর্তা হন কিংবা কনসালট্যান্সি করেন বা কোনোভাবে যদি ওই কোম্পানির সঙ্গে তাঁর বৈষয়িক সম্পর্ক থাকে, তাহলে আর তাঁর মতামত বিশেষজ্ঞ মতামত থাকে না, সেটা হয়ে দাঁড়ায় কোম্পানির পক্ষে একটি প্রচারণা। আমি বাংলাদেশে এ পর্যন্ত কোনো স্বাধীন খনি বিশেষজ্ঞ বা ভূতাত্ত্বিককে উন্মুক্ত খনির পক্ষে কথা বলতে দেখিনি। বরং স্বাধীন জ্ঞানচর্চার সঙ্গে যুক্ত অনেক বিশেষজ্ঞ নিজেদের সামাজিক দায়বোধ থেকে উন্মুক্ত খনির বিপদ সম্পর্কে আমাদের সচেতন করেছেন। তাঁদের মধ্যে আছেন, প্রকৌশল বিশ্ববিদ্যালয়ের প্রবীণ শিক্ষক ও জ্বালানি বিশেষজ্ঞ ড. নূরুল ইসলাম, কানাডার রেজিনা বিশ্ববিদ্যালয়ের ভূতত্ত্ব বিভাগের শিক্ষক এবং ভূতাত্ত্বিক ড. বদরুল ইমাম, ঢাকা বিশ্ববিদ্যালয়ের ভূতত্ত্ব বিভাগের শিক্ষক এবং ভূতাত্ত্বিক ড. আফতাব আলম খান, যুক্তরাষ্ট্রের লক হ্যাভেন বিশ্ববিদ্যালয়ের ভূতত্ত্ব বিভাগের শিক্ষক এবং ভূতাত্ত্বিক ড. খালেকুজ্জামান, বিএইচপির সাবেক কনসালট্যান্ট ও ভূতাত্ত্বিক নজরুল ইসলাম, জ্বালানি বিশেষজ্ঞ ও চট্টগ্রাম প্রকৌশল ও প্রযুক্তি বিশ্ববিদ্যালয়ের শিক্ষক ড. শামসুল আলম, পেট্রোলিয়াম ও খনি বিশেষজ্ঞ প্রকৌশলী এ কে এম শামসুদ্দীন, পানি বিশেষজ্ঞ ও পানি উন্নয়ন বোর্ডের সাবেক মহাপরিচালক প্রকৌশলী ইনামুল হক, প্রকৌশলী বি ডি রহমতুল্লাহ এবং ভূতাত্ত্বিক ড. রফিকুল ইসলাম, যিনি সমপ্রতি বড়পুকুরিয়া কয়লাখনি নিয়েই জাপানে পিএইচডি গবেষণা সমাপ্ত করেছেন। বাংলাদেশের শীর্ষস্থানীয় প্রকৌশলী শেখ মুহম্মদ শহীদুল্লাহর কথা আর নাই বা বললাম।<br />
ইউনুস আকন বলেছেন, উন্মুক্ত পদ্ধতিতে শতকরা ৯০ ভাগ কয়লা উত্তোলন করা যায়। কিন্তু বলেননি, এই বিপুল পরিমাণ কয়লার মালিকানা কার হাতে থাকবে? যে কয়লা রাখতে দিনাজপুরের মতো শহরের সমান স্থান দরকার, তার মালিকানা যদি বাংলাদেশের না থাকে, যদি অধিকাংশ কয়লা বিদেশে রপ্তানি হয় এবং তার জন্য যদি ধ্বংসযজ্ঞের শিকার হতে হয়, তাহলে কেন আমরা সেই পথ নেব?<br />
তিনি আরও বলেছেন, বড়পুকুরিয়ায় উন্মুক্ত পদ্ধতিতে কয়লাখনি না করায় বাংলাদেশের অনেক ক্ষতি হয়েছে। কিন্তু কেন সেখানে উন্মুক্ত পদ্ধতি করা হয়নি? কেন ফুলবাড়ীতে উন্মুক্ত খনির উদ্যোগ থেকে অস্ট্রেলিয়ার খ্যাতনামা মাইনিং কোম্পানি বিএইচপি পিছিয়ে গেল? সে সময় তো কোনো জনপ্রতিরোধ ছিল না, তাহলে? ১৯৮৭-৯১ জুড়ে বিখ্যাত ব্রিটিশ প্রতিষ্ঠান মেসার্স ওয়ার্ডেল আর্মস্ট্রং বড়পুকুরিয়া কয়লাখনিতে ‘টেকনো-ইকোনমিক ফিজিবিলিটি স্টাডি’ পরিচালনা করে। সমীক্ষা শেষে তাঁরা স্পষ্ট সিদ্ধান্ত টানেন, বাংলাদেশের ভূপ্রাকৃতিক গঠন বিশেষত পানির স্তরের কারণে উন্মুক্ত খনি কোনোভাবেই সম্ভব নয়।<br />
অন্যদিকে ১৯৯৪ সালে ফুলবাড়ী কয়লাখনি অনুসন্ধানের অধিকার লাভ করে বিশ্বের অন্যতম বৃহৎ কয়লা কোম্পানি অস্ট্রেলিয়ার বিএইচপি। সে সময় এই প্রতিষ্ঠানের সঙ্গে যুক্ত ছিলেন ভূতাত্ত্বিক নজরুল ইসলাম। তিনি এখন সিডনিতে অবসরজীবন যাপন করছেন। ব্যক্তিগত আলোচনায় এবং সংবাদপত্রে লিখিত প্রবন্ধের মাধ্যমে তিনি জানিয়েছেন যে ফুলবাড়ী কয়লাখনির গভীরতা, বিশাল সমৃদ্ধ পানির স্তর ও ঘন জনবসতি দেখে বিএইচপি এই সিদ্ধান্তে আসে যে এখানে উন্মুক্ত খনি কারিগরি কারণেই করা সম্ভব নয়। এর ক্ষতি সামাল দেওয়ার অভিজ্ঞতাও তাদের নেই। এ জন্যই তারা সমৃদ্ধ খনির কর্তৃত্ব পেয়েও তা ছেড়ে দিয়ে বাংলাদেশ ত্যাগ করে। সে সময় অর্থাৎ ১৯৯৭ সালেই গঠিত হয় এশিয়া এনার্জি। একটি সম্পূর্ণ নতুন ও অনভিজ্ঞ কোম্পানি রহস্যজনকভাবে একটি সমৃদ্ধ কয়লাখনির কর্তৃত্ব লাভ করে। বাংলাদেশের যোগ্যতা, দক্ষতা ও সক্ষমতা নিয়ে যাঁরা সন্দেহ প্রচার করেন, তাঁরা নতুন অনভিজ্ঞ কোম্পানির হাতে কয়লাখনি ছেড়ে দেওয়ার বিষয়ে আপত্তি করেননি।<br />
যে কয়টি প্রধান কারণে আমরা উন্মুক্ত পদ্ধতিতে কয়লা উত্তোলনকে বাংলাদেশের খাদ্য নিরাপত্তা, পানিসম্পদ, জ্বালানি নিরাপত্তা ও জননিরাপত্তা অর্থাৎ জাতীয় স্বার্থের জন্য বড় হুমকি মনে করি সেগুলোর মধ্যে আছে:<br />
পানিসম্পদ: উন্মুক্ত খনির জন্য পুরো অঞ্চলকে শুকনো খটখটে করতে হবে, যার জন্য প্রতিদিন ৫০ থেকে ৮০ কোটি লিটার পানি ভূগর্ভস্থ স্তর থেকে প্রত্যাহার করতে হবে। খনি এলাকা শুকনো বানানোর লক্ষ্যে এভাবে পানি প্রত্যাহার করতে থাকলে উত্তরবঙ্গের বিশাল অঞ্চলেও পানির স্তর নিচে নেমে যাবে। এ রকম বিপর্যয় সামাল দেওয়ার কোনো দৃষ্টান্ত কোথাও নেই। বিশ্বব্যাপী যেখানে সুপেয় পানির সংকট, সেখানে নিজেদের বিশাল সম্পদ ধ্বংসের প্রস্তাব কীভাবে গ্রহণযোগ্য হতে পারে? পানির স্তর এভাবে নেমে গেলে খনি এলাকার বাইরেও বিস্তৃত এলাকাজুড়ে ফসল, বৃক্ষরাজি উৎপাদন অসম্ভব হবে। এর সঙ্গে যুক্ত হবে ওপরের পানির অভূতপূর্ব দূষণ, যা জালের মতো ছড়িয়ে থাকা নদী-খাল-বিল হয়ে ছড়িয়ে পড়বে সারা দেশে।<br />
আবাদি জমি: শুধু খনির কারণেই একটি বিশাল এলাকার তিন ফসলি আবাদি জমি বিনষ্ট হবে। এর বাইরেও পানির স্তর নিচে নেমে যাওয়া ও পানিদূষণের কারণে আরও বৃহত্তর অঞ্চলের জমি আবাদ অযোগ্য হয়ে পড়বে। সামগ্রিক খাদ্য উৎপাদন ও খাদ্য নিরাপত্তা বড় আকারের হুমকির মধ্যে পড়বে।<br />
প্রাণবৈচিত্র্য: এসিড ড্রেইনেজসহ দূষণযজ্ঞে প্রাণবৈচিত্র্যের ক্ষতি সমগ্র দেশের প্রতিবেশগত ভারসাম্য নষ্ট করবে।<br />
জ্বালানি সম্পদ পাচার: এই সম্পদ অনবায়নযোগ্য, একবার তুলে ফেললে তা আর ভরানো বা পুনরুৎপাদন করা যায় না। তাই জ্বালানি নিরাপত্তার জন্য মজুদ সীমিত থেকে প্রয়োজন অনুযায়ী তুলে অনেক দিন ধরে ব্যবহার করাই ভালো। আর একবারে অনেকটা তুলে ব্যবহার করা যেহেতু বাংলাদেশের জন্য সম্ভব নয়, সেহেতু উন্মুক্ত পদ্ধতির অপরিহার্য পরিণতি বিপুল অংশের রপ্তানি। এবং বিদেশি মালিকানায় থাকায় এ রপ্তানি আয় বাংলাদেশ পাবে না।<br />
অসংখ্য মানুষের জীবন ও জীবিকা। খনি অঞ্চলের কয়েক লাখ মানুষই শুধু নয়, পানিসম্পদ নষ্ট ও উর্বরতা বিনাশের কারণে উত্তরবঙ্গের বিশাল অঞ্চলের মানুষ কৃষি, গবাদিপশু, মৎস্যসহ বিভিন্ন ক্ষেত্রে জীবিকার সংকটে সৃষ্টি হবে।<br />
তাহলে এমন প্রকল্পকে কি উন্নয়ন প্রকল্প বলা যায়, যা আমাদের উৎকৃষ্ট মানের কয়লা দ্রুত বিদেশে পাচারের ব্যবস্থা করবে, এবং তা করার জন্য দেশের সমৃদ্ধ পানিসম্পদ ও বিশ্বের অন্যতম শ্রেষ্ঠ উর্বর জমি বিনাশ করবে এবং কয়েক কোটি মানুষের জীবন ও জীবিকা হুমকির মধ্যে ফেলবে?<br />
বর্তমান বিশ্বে মাটি-পানি-জীববৈচিত্র্যসহ সামগ্রিক পরিবেশ এবং জনবসতি ও জীবন-জীবিকার ওপর উন্মুক্ত খনন পদ্ধতির বিষফল সম্পর্কে সচেতনতা বাড়ছে। কোনো কোনো দেশে এই পদ্ধতি আইন করে নিষিদ্ধ হচ্ছে। বিভিন্ন দেশে কয়লা সম্পদের সর্বোত্তম ব্যবহারের জন্য এখন নতুন নতুন অনেক পদ্ধতি নিয়ে কাজ হচ্ছে। উর্বর জমি, অমূল্য পানিসম্পদ ও মানুষের স্বার্থে বাংলাদেশের জন্য সঠিক পদ্ধতি বাছাই ও কার্যকর করার মতো যোগ্যতা ও প্রাতিষ্ঠানিক কাঠামো আমাদেরই দাঁড় করাতে হবে।<br />
জীবন দিয়ে দেশের সম্পদ ও মানুষকে রক্ষা করে ফুলবাড়ীসহ উত্তরবঙ্গের বিশাল অংশের মানুষ তাঁদের আন্দোলন অবস্থানকে তিনটি কথায় প্রকাশ করেন: উন্মুক্ত না, বিদেশি না, রপ্তানি না। জনগণের এই সুস্পষ্ট রায় বা এই তিনটি ‘না’ প্রকৃতপক্ষে একটি বৃহৎ ও শক্তিশালী ‘হ্যাঁ’কে প্রকাশ করে। সেগুলো হলো, দেশের সম্পদ দেশেই থাকবে, কোনো গোষ্ঠীর মুনাফা বা রপ্তানির জন্য নয়, বিদ্যুতায়ন ও শিল্পায়নসহ দেশের কাজে এই সম্পদের প্রতিটি বিন্দু কাজে লাগানোর জন্যই তার উত্তোলন হবে।<br />
কয়লা সম্পদের সর্বোত্তম সদ্ব্যবহার নিশ্চিত করার জন্য আমাদের প্রথম কাজ হলো সর্বনাশা ‘উন্মুক্ত খনি পদ্ধতি’ ও ‘খনিজ সম্পদ রপ্তানি’ নিষিদ্ধ করা। দ্বিতীয় হলো জাতীয় শতভাগ মালিকানা নিশ্চিত করে যথাযথ পদ্ধতিতে এই সম্পদের ব্যবহারের জন্য জাতীয় সংস্থা গঠন এবং শিক্ষা ও গবেষণার মাধ্যমে নতুন একটি দক্ষ প্রজন্ম গড়ে তোলার মাধ্যমে জাতীয় সক্ষমতার বিকাশ। তৃতীয়ত, এই কাজ সফলভাবে করার জন্য দুর্নীতিবাজ ও বিদেশি কোম্পানির স্বার্থরক্ষকদের রাহুগ্রাস থেকে জ্বালানি মন্ত্রণালয় ও দেশকে মুক্ত করা।<br />
আনু মুহাম্মদ: অর্থনীতিবিদ। বিভাগীয় প্রধান, অর্থনীতি বিভাগ, জাহাঙ্গীরনগর বিশ্ববিদ্যালয়।<br />
<a href="http://www.prothom-alo.com/detail/date/2010-08-03/news/83518"></a></p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F08%2F02%2F%25e0%25a6%2595%25e0%25a7%259f%25e0%25a6%25b2%25e0%25a6%25be%25e0%25a6%2596%25e0%25a6%25a8%25e0%25a6%25bf-%25e2%2580%2598%25e0%25a6%2589%25e0%25a6%25a8%25e0%25a7%258d%25e0%25a6%25ae%25e0%25a7%2581%25e0%25a6%2595%25e0%25a7%258d%25e0%25a6%25a4-%25e0%25a6%25a8%25e0%25a6%25be-%25e0%25a6%25ac%25e0%25a6%25bf%25e0%25a6%25a6%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>বিদ্যুৎ সঙ্কট ও জনস্বার্থ &#8211; গোলটেবিল আলোচনা</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F24%2F%25e0%25a6%25ac%25e0%25a6%25bf%25e0%25a6%25a6%25e0%25a7%258d%25e0%25a6%25af%25e0%25a7%2581%25e0%25a7%258e-%25e0%25a6%25b8%25e0%25a6%2599%25e0%25a7%258d%25e0%25a6%2595%25e0%25a6%259f-%25e0%25a6%2593-%25e0%25a6%259c%25e0%25a6%25a8%25e0%25a6%25b8%25e0%25a7%258d%25e0%25a6%25ac%25e0%25a6%25be%25e0%25a6%25b0%25e0%25a7%258d%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F24%2F%25e0%25a6%25ac%25e0%25a6%25bf%25e0%25a6%25a6%25e0%25a7%258d%25e0%25a6%25af%25e0%25a7%2581%25e0%25a7%258e-%25e0%25a6%25b8%25e0%25a6%2599%25e0%25a7%258d%25e0%25a6%2595%25e0%25a6%259f-%25e0%25a6%2593-%25e0%25a6%259c%25e0%25a6%25a8%25e0%25a6%25b8%25e0%25a7%258d%25e0%25a6%25ac%25e0%25a6%25be%25e0%25a6%25b0%25e0%25a7%258d%2F#comments</comments>
		<pubDate>Sat, 24 Jul 2010 13:12:41 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[bangla বাংলা]]></category>
		<category><![CDATA[জ্বালানি সংবাদ]]></category>
		<category><![CDATA[কয়লা খনি]]></category>
		<category><![CDATA[কুইক রেন্টাল]]></category>
		<category><![CDATA[গ্যাস]]></category>
		<category><![CDATA[জ্বালানি]]></category>
		<category><![CDATA[পিডিবি]]></category>
		<category><![CDATA[বিদ্যুত কেন্দ্র]]></category>
		<category><![CDATA[বিদ্যুৎ]]></category>
		<category><![CDATA[বিদ্যুৎ ও গ্যাস]]></category>
		<category><![CDATA[লোডশেডিং]]></category>
		<category><![CDATA[েকয়লা]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2895</guid>
		<description><![CDATA[ক্রোড়পত্র] বিদ্যুৎ সঙ্কট ও জনস্বার্থ

বিদ্যুৎ সঙ্কট চলছে। চলছে উত্তরণের চেষ্টা। সেই চেষ্টার সঙ্গে জড়িত হয়েছে জনস্বার্থের প্রশ্ন। দিনে দিনে  বিদ্যুৎ খাতে বেসরকারিকরণ বাড়ছে। দুর্বল হচ্ছে সরকারি খাত।
জ্বালানি খাত নিয়ে ধারাবাহিক কাজের আওতায় সাপ্তাহিক আয়োজন করে এক গোলটেবিল আলোচনার। ১০ জুলাই ২০১০ শুক্রবার সকাল ১০টায় বিয়াম ফাউন্ডেশনের মাহবুব কবীর মেমোরিয়াল হলে ‘বিদ্যুৎ সঙ্কট ও জনস্বার্থ’ [...]]]></description>
			<content:encoded><![CDATA[<h1>ক্রোড়পত্র] বিদ্যুৎ সঙ্কট ও জনস্বার্থ</h1>
<p><a rel="attachment wp-att-2896" href="http://www.bdelink.com/index.php/2010/07/24/%e0%a6%ac%e0%a6%bf%e0%a6%a6%e0%a7%8d%e0%a6%af%e0%a7%81%e0%a7%8e-%e0%a6%b8%e0%a6%99%e0%a7%8d%e0%a6%95%e0%a6%9f-%e0%a6%93-%e0%a6%9c%e0%a6%a8%e0%a6%b8%e0%a7%8d%e0%a6%ac%e0%a6%be%e0%a6%b0%e0%a7%8d/shaptahik-gol/"><img class="aligncenter size-full wp-image-2896" title="shaptahik gol" src="http://www.bdelink.com/wp-content/uploads/2010/07/shaptahik-gol.bmp" alt="" /></a></p>
<h3>বিদ্যুৎ সঙ্কট চলছে। চলছে উত্তরণের চেষ্টা। সেই চেষ্টার সঙ্গে জড়িত হয়েছে জনস্বার্থের প্রশ্ন। দিনে দিনে  বিদ্যুৎ খাতে বেসরকারিকরণ বাড়ছে। দুর্বল হচ্ছে সরকারি খাত।<br />
জ্বালানি খাত নিয়ে ধারাবাহিক কাজের আওতায় সাপ্তাহিক আয়োজন করে এক গোলটেবিল আলোচনার। ১০ জুলাই ২০১০ শুক্রবার সকাল ১০টায় বিয়াম ফাউন্ডেশনের মাহবুব কবীর মেমোরিয়াল হলে ‘বিদ্যুৎ সঙ্কট ও জনস্বার্থ’ শীর্ষক এই গোলটেবিল আলোচনার প্রস্তাবনা উপস্থাপন করেন শুভ কিবরিয়া। গোলটেবিল আলোচনা সমন্বয়ের দায়িত্ব পালন করেন জব্বার হোসেন। সাপ্তাহিক সম্পাদক গোলাম মোর্তোজার সঞ্চালনে অনুষ্ঠিত এই গোলটেবিল আলোচনার সারসংক্ষেপ নিয়ে প্রকাশিত হলো ক্রোড়পত্রটি।</h3>
<p><a rel="attachment wp-att-288" href="http://www.bdelink.com/index.php/2010/01/22/rental-power/shaptahik/"><img class="alignleft size-full wp-image-288" title="shaptahik" src="http://www.bdelink.com/wp-content/uploads/2010/01/shaptahik.jpg" alt=" সাপ্তাহিক" width="112" height="46" /></a></p>
<h3>সূচনা বক্তব্য<br />
গোলাম মোর্তোজা<br />
সবাইকে শুভেচ্ছা। অন্যান্য আলোচনার চেয়ে আমাদের এবারের আলোচনাটিতে এবার একটু ভিন্নতা এনেছি। আগে আমরা যেসব আলোচনার আয়োজন করতাম সেগুলোতে বিশেষজ্ঞ আলোচকদের সঙ্গে বিভিন্ন ক্ষেত্রের গুরুত্বপূর্ণ ব্যক্তিদের আমন্ত্রণ জানাতাম। সেখানে সময়ের তুলনায় বিশেষজ্ঞ আলোচকের সংখ্যা বেশি হয়ে যাওয়াতে আমরা সবাইকে ঠিকমতো কথা বলতে দিতে পারতাম না। তাই এবারের আলোচনায় আমরা এমন কিছু গুরুত্বপূর্ণ ব্যক্তিত্বকে আমন্ত্রণ জানিয়েছি যারা সত্য কথা বলেন, দেশ ও জাতি নিয়ে চিন্তা করেন। তাদের কাছ থেকেই আমরা আজকের বিষয়ের ওপর বিস্তারিতভাবে জানতে চাই।<br />
আশা করি তাদের কথার মাধ্যমে আমাদের দেশের বিদ্যুৎ সেক্টরের বর্তমান অবস্থার প্রকৃত চিত্র উঠে আসবে। আর এই চিত্রটি এখানে উপস্থিত সকল প্রিন্ট ও ইলেকট্রনিক মিডিয়ার মাধ্যমে সারা জাতির কাছে একটি বার্তা পাঠাবে পৌঁছাবে। প্রকৃত তথ্যকে আড়াল করে, অর্ধসত্য, বিকৃত তথ্য দিয়ে মিথ্যার মিশ্রণে আমাদের সরকারগুলো জাতিকে বিভ্রান্ত করতে চায়। এসবের মাধ্যমে দেশের অপরিমেয় ক্ষতি হয়ে যায়। সেই ক্ষতিটা যাতে না হয় সে কারণে প্রকৃত তথ্যটি দেশবাসীকে জানাতে চাই। জানানোর প্রক্রিয়া স্বরূপ আজকে আমাদের এই আয়োজনÑ ‘বিদ্যুৎ সঙ্কট ও জনস্বার্থ।’ প্রথমেই এ বিষয়ে আলোচনার প্রস্তাবনা তুলে ধরার জন্য আমন্ত্রণ জানাচ্ছি শুভ কিবরিয়াকে।</h3>
<h3>আলোচনার প্রস্তাবনা<br />
শুভ কিবরিয়া<br />
সবাইকে শুভেচ্ছা। আলোচনার সূত্রপাত হিসেবে সাপ্তাহিক-এর পক্ষ থেকে প্রস্তাবনা উপস্থাপন করছি।<br />
বিদ্যুৎ সঙ্কট একটি পুরনো ঘটনা। উৎপাদন এবং চাহিদার ফারাক যত বাড়ছে, ততই বাড়ছে  লোডশেডিং। বাড়ছে দুর্ভোগ। ক্ষতিগ্রস্ত হচ্ছে দেশের অর্থনীতি। এবং এই সঙ্কট যত ঘনীভূত হচ্ছে দায়িত্বশীল সরকারগুলোর মধ্যে পরস্পরকে দোষারোপ করার প্রবণতা এবং এখাতে দুর্নীতির বিষয়টি ততই বড় হয়ে উঠছে। বিগত সেনাসমর্থিত তত্ত্বাবধায়ক সরকারের শাসনামলে দেশের দুই বড় দলের দুই নেত্রী সাবেক দুই প্রধানমন্ত্রীর বিরুদ্ধে জ্বালানি ও বিদ্যুৎ খাতের নানাবিধ দুর্নীতি নিয়ে বড় বড় মামলা হয়।<br />
সেই স্মৃতি স্মরণে রাখা দরকার।<br />
গোটা দেশে বিদ্যুৎ সরবরাহ বাড়ানোর জন্য বিদ্যুৎ সরবরাহ লাইন তৈরিতে বিদ্যুতের খুঁটি বা খাম্বা বিষয় দুর্নীতির কাহিনী এক সময় সাড়া জাগিয়েছে সেই ইতিহাস ভুলে গেলে চলবে না।<br />
বছরের পর বছর এসব ঘটনা ঘটেছে। দুর্বল হয়েছে বিদ্যুৎ খাত। দক্ষ জনশক্তি আর প্রাতিষ্ঠানিক সক্ষমতার শক্তিমত্ত প্রতিষ্ঠান বিদ্যুৎ উন্নয়ন বোর্ড বা পিডিবিকে বিদেশি পরামর্শে টুকরো টুকরো করা হয়েছে। ১৯৯৬ সাল থেকে বেসরকারি খাতে বিদ্যুৎ তৈরির আইন বানিয়ে বেসরকারি খাতে বিদ্যুৎ কিনে অনেক কম দামে তা বিক্রি করে দেউলিয়া হয়েছে।<br />
পাবলিক প্রতিষ্ঠানকে এমনভাবে ধ্বংস করার নজির সম্ভবত পৃথিবীর ইতিহাসে কমই আছে। অধিকন্তু পিডিবির নিজস্ব বিদ্যুৎ উৎপাদন ব্যবস্থায় ‘জেনারেটর’র পুরনো হয়েছে ( যেমন ১৯৬২ সালে স্থাপিত কাপ্তাই ২৪০ মেগাওয়াট বিদ্যুৎ জেনারেটর এখনো বহাল আছে) কিন্তু তা প্রতিস্থাপনের ব্যবস্থা নেয়া হয়নি। পিডিবির রক্ষণাবেক্ষণ কাজে নানারকম আইনি এবং ট্যাক্স বিষয় জটিলতা বেড়েছে, আর্থিক প্রণোদনা সরবরাহ হয়নি। ফলে অকেজো এবং পুরনো লক্কড়ঝক্কড় বিদ্যুৎ উৎপাদন ব্যবস্থার সুরাহা করতে পারেনি পিডিবি।<br />
অন্যদিকে পিডিবির হাতে থাকা বিদ্যুৎ সরবরাহ ব্যবস্থা দিনের পর দিন ‘সিস্টেম লস’ নামের চুরির হাতে পড়ে লোকসান গুনছে। চুরি, অনাদায়ী বকেয়া বিল এর কারণে আর্থিক সঙ্কট কখনো যায়নি পিডিবির। এর ওপর বিষফোঁড়া হয়ে বসে স্বায়ত্তশাসিত প্রতিষ্ঠানের ট্রেড ইউনিয়ন সন্ত্রাস। ফলে পিডিবির রুগ্নতা কমেনি।<br />
পিডিবিকে বাঁচাতে কাটা-ছেঁড়া হয়েছে বিস্তর। ডেসা, ডেসকো, ডিপিডিসি ইত্যাদি নামের বহু প্রতিষ্ঠানের জন্ম হয়েছে। এই কাহিনী পুরনো।<br />
তবুও পুনরাবৃত্তি করলাম  আসল রোগটার কথা স্মরণ করার জন্য।<br />
আসলে দীর্ঘদিন ধরে এক গভীর ষড়যন্ত্র ছিল বিদ্যুৎ খাতকে নিয়ে। তা স্পষ্ট হয়ে গেল মহাজোট সরকার ক্ষমতায় আসার পর।<br />
গত দেড় দশক ধরে দেশের বিদ্যুৎ ব্যবস্থাকে ব্যক্তি মালিকানায়, গোষ্ঠী মালিকানায় তুলে দেয়ার যে সুগভীর ষড়যন্ত্র হচ্ছিল তার কফিনে বড় পেরেক মারা হলো এবার এই মহাজোট শাসনামলে।<br />
দ্রুত বিদ্যুৎ সঙ্কট নিরসনে বিনা টেন্ডারে চড়া দামে ‘কুইক রেন্টাল’ বা দ্রুত ভাড়ায় বিদ্যুৎ প্ল্যান্ট স্থাপনের এক নজিরবিহীন সমাধান এনে।<br />
বর্তমান সরকার বিদ্যুৎ উৎপাদনে যেসব ব্যবস্থা নিয়েছে বা নিচ্ছে তার পুরো চিত্র বর্ণনা করেছেন মান্যবর অর্থমন্ত্রী জাতীয় সংসদে বাজেট পেশের সময়। তার বাজেট বক্তৃতা থেকে উদ্ধৃত করিÑ<br />
অনুচ্ছেদ ৫৩ ॥ বিদ্যুৎ ঘাটতির কারণে জনগণের ভোগান্তি বেড়েছে, শিল্প উৎপাদন বাধাগ্রস্ত হয়েছে, ক্ষতিগ্রস্ত হচ্ছে ব্যবসা-বাণিজ্য। ২০০৯ সালের জানুয়ারি বিদ্যুৎ উৎপাদনে আমাদের সামর্থ্য (ডিরেটেড ক্ষমতা) ছিল ৫০০০ মেগাওয়াট, কিন্তু আমাদের প্রকৃত উৎপাদন ছিল মাসিক গড় অনুযায়ী ৩৫২৫ মেগাওয়াট। আমাদের সামর্থ্য এবং প্রকৃত উৎপাদন ছিল এই বিরাট তফাতের কারণ হলোÑ প্রথমত, প্রায় এক-তৃতীয়াংশ বিদ্যুৎ কেন্দ্র অত্যন্ত পুরনো এবং সেগুলোকে অবসর দেয়া উচিত। দ্বিতীয়ত, আমাদের গ্যাস সরবরাহ সবসময় যথোপযুক্ত না হওয়ায় অনেক বিদ্যুতকেন্দ্র অনেক সময় অচল থাকে। তৃতীয়ত, আমাদের সঞ্চালন ও বিতরণ ব্যবস্থা দারুণভাবে ত্রুটিপূর্ণ এবং অপর্যাপ্ত।<br />
অনুচ্ছেদ ৫৪ ॥ ২০১০ সালের মে মাসে আমাদের উৎপাদনের ডিরেটেড ক্ষমতা ৫৫২০ মেগাওয়াটে উন্নীত হলেও প্রকৃত উৎপাদন মাসিক গড় ৪০৭০ মেগাওয়াটের বেশি হচ্ছে না। এ ক্ষেত্রে গ্যাস সঙ্কট প্রধান অন্তরায় হয়ে দেখা দিয়েছে। বিদ্যুৎ খাতে সঙ্কটের অতিরিক্ত কারণ হলো আমাদের প্রলম্বিত টেন্ডার প্রক্রিয়া এবং অনেক সময় টেন্ডারের বিপরীতে যথোপযুক্ত সাড়া না পাওয়া। আমরা ২০০৯ সালের সেপ্টেম্বরে ৫৩০ মেগাওয়াটের জন্য দরপত্র আহ্বান করে ৬৩টি দরপত্র পাই এবং ৩০০ মেগাওয়াটের জন্য এ্যাওয়ার্ডের মাধ্যমে আমরা ক্রয় প্রক্রিয়ার স্বচ্ছতা এবং গ্রহণযোগ্যতা প্রতিষ্ঠা করতে পেরেছি এবং একই সঙ্গে বাজারমূল্যের একটি ধারণা পাওয়া গেছে। এর পরেই আমরা বিদ্যুৎ খাতকে জরুরি খাত হিসেবে ঘোষণা করেছি এবং রাষ্ট্রীয় জরুরি প্রয়োজন বিবেচনা করে বিদ্যুৎ ভাড়া/ক্রয়/উৎপাদনে সরাসরি পদ্ধতি গ্রহণ করেছি। এ উদ্যোগের আওতায় আমরা ইতোমধ্যে ১১০৭ মেগাওয়াট ক্ষমতাসম্পন্ন বিদ্যুতকেন্দ্র স্থাপনের চুক্তি সম্পাদন করেছি। যার মধ্যে দুটি ডিজেল এবং ৯টি ফার্নেস অয়েলভিত্তিক।<br />
(এটি এখন ৪টি ডিজেল ও ৯টি ফার্নেস অয়েলভিত্তিক)<br />
অনুচ্ছেদ ৫৫ ॥ এখানে উল্লেখ্য যে, নতুন কর্মপরিকল্পনায় আমরা বিদ্যুৎ উৎপাদনের উৎস হিসেবে গ্যাস ছাড়াও ফার্নেস অয়েল এবং ডিজেলকে বিবেচনায় নিয়েছি। এতে বিদ্যুৎ উৎপাদন খরচ বেশি পড়বে এবং যে অতিরিক্ত অর্থের প্রয়োজন হবে তা ভর্তুকি এবং বিক্রয়মূল্যের নতুন বিন্যাস করে মেটাতে হবে।<br />
অনুচ্ছেদ ৫৯ ॥ আমি দ্ব্যর্থহীন কণ্ঠে বলতে চাই যে, আমাদের সরকার বর্তমান মেয়াদেই বিদ্যুৎ সমস্যার একটি গ্রহণযোগ্য সমাধান বাংলাদেশের জনগণকে উপহার দিতে চায়। এ লক্ষ্যে তাৎক্ষণিক, স্বল্পমেয়াদি, মধ্যমেয়াদি এবং দীর্ঘমেয়াদি বিদ্যুৎ উৎপাদন সম্প্রসারণ পরিকল্পনা গ্রহণ করা হয়েছে। আমি আশা করছি, এ খাতে সরকারের সুনির্দিষ্ট পরিকল্পনা বাস্তবায়নের মাধ্যমে ২০১২ সালের মধ্যে বিদ্যুতের চাহিদা ও উৎপাদনের পার্থক্য আমরা দূর করতে সক্ষম হব এবং ২০১৫ সালের বিদ্যুৎ ও জ্বালানি সরবরাহ, উন্নয়নের কোনো প্রতিবন্ধকতা বলে বিবেচিত হবে না। লক্ষণীয় হলো যে, ভবিষ্যতে বেসরকারি খাতে বিদ্যুৎ সরবরাহ অনেক বেড়ে যাবে এবং গ্যাস ছাড়াও অন্যান্য জ্বালানি সূত্রের ব্যবহার প্রসার লাভ করবে।<br />
রেন্টাল পাওয়ার দিয়ে যে বিদ্যুৎ আসছে তার মূল্য পড়ছে ডিজেল জ্বালানিতে ১৩.৩২ থেকে ১৪.৩৯ টাকা। ফার্নেস অয়েল চালিত জ্বালানিতে ৭.৭১ থেকে ৭.৭৮ টাকা। সাম্প্রতিক উদ্যোগে ১১৫৭ মেগাওয়াট বিদ্যুৎ আসবে এই রেন্টাল পাওয়ার থেকে। কিন্তু এই দামে কেনা বিদ্যুৎ পিডিবি বিক্রি করবে গড়ে প্রায় ইউনিট প্রতি ২.৭০ টাকায়। ফলে এই পরিমাণ বিদ্যুৎ কেনা বেচায় প্রায় ৫ হাজার কোটি টাকার ঘাটতি দেখা দেবে পিডিবির। এই টাকা ভর্তুকি দিতে হবে সরকারকে।<br />
ভারত থেকে বিদ্যুৎ ক্রয়ের প্রক্রিয়া চলছে। ভারত থেকে আপাতত ২৫০ মেগাওয়াট বিদ্যুৎ কিনছে বাংলাদেশ। অদূর ভবিষ্যতের পরিমাণ ৫০০ মেগাওয়াটে যাবে। এই বিদ্যুৎ আসতে সঞ্চালন লাইন তৈরি হচ্ছে। ভারতের বহরমপুর থেকে বাংলাদেশের কুষ্টিয়ার ভেড়ামারা পর্যন্ত ১৩০ কিলোমিটার হাইভোল্টেজ সঞ্চালন লাইনের মধ্যে বাংলাদেশের পড়বে ৮৫ কিলোমিটার, ভারতে ৪৫ কিলোমিটার। খরচ হবে ৯২০ কোটি রুপি। ভারত খরচ করবে ১৭০ কোটি রুপি। ৩০ বছরে যার খরচ মেটাবে বাংলাদেশ। অন্যদিকে পিডিবি খরচ করবে ৭৫০ কোটি রুপি।<br />
ভারতের বহরমপুর পর্যন্ত বিদ্যুৎ আনতে সঞ্চালন লাইনের হুইলিং চার্জ দেবে বাংলাদেশ। ভারতের যতদূর থেকে এই বিদ্যুৎ আসবে হুইলিং চার্জ তত বেশি গুনতে হবে বাংলাদেশকে।<br />
ভারতে গ্রিড বিদ্যুৎতের দাম পুঁজিবাজারের মতো ওঠানামা করে। সেই ওঠানামার ধকল সইতে হবে বাংলাদেশকে। বিদ্যুতের দাম এবং হুইলিং চার্জ দুটোই ঠিক করে দেবে ভারতীয় কেন্দ্রীয় রেগুলেটরি কমিশন। দাম নির্ধারণের সময় শুনানিতে উপস্থিত থাকতে পারবে বাংলাদেশের প্রতিনিধি।<br />
খুলনায় কয়লাভিত্তিক ২৬৬০= ১ হাজার ৩২০ মেগাওয়াট ক্ষমতার ভারতÑবাংলাদেশ যৌথভিত্তিক বিদ্যুতকেন্দ্র স্থাপিত হবে। তার কোম্পানি বোর্ডেও কতৃত্ব থাকবে ভারতের খবর বলে মিলছে।<br />
এখন দৃষ্টি ফেরানো যাক মহাজোট সরকারের বিদ্যুৎ সমাধানের প্রক্রিয়ার দিকে।<br />
সরকারের মূল বিবেচনা বেসরকারি খাত। অর্থমন্ত্রী বাজেটে তাই বলেছেন। সরকারের লক্ষ্য বেশি দামে বিদ্যুৎ কেনা। লক্ষ্য ছোট ছোট বিদ্যুতকেন্দ্র তৈরি। দরপত্রবিহীন সমঝোতায় কুইক রেন্টাল সরকারের যে পছন্দের বিষয় তা দেখাই যাচ্ছে।<br />
এই প্রক্রিয়ায় দেশের স্বাধীন বিদ্যুৎখাতকে ব্যক্তি ও গোষ্ঠী মালিকানায় রূপান্তরিত করে বিদ্যুতকে চড়া দামের করে ফেললে লাভ কার?<br />
বিদ্যুতের দাম হু হু করে বেড়ে গেলে দেশের নিজস্ব শিল্পায়ন কি বিকশিত হবে?<br />
দেশের অধিকসংখ্যক মানুষের কাছে কি এই চড়া দামের বিদ্যুৎ পৌঁছানো যাবে?<br />
হাজার হাজার কোটি টাকার ভর্তুকির রেন্টাল বিদ্যুতভূত কি আছর ফেলবে না সার্বিক জনস্বার্থে?<br />
পৃথিবীব্যাপী যেখানে বড় বিদ্যুতকেন্দ্র নির্মাণ করে গ্রিড বিদ্যুতকে জোর দেয়া হয় সেখানে এই ক্ষুদ্র ক্ষুদ্র অফগ্রিড বিদ্যুতকেন্দ্র নির্মাণ কারিগরি বিবেচনায় কতটা সক্ষমতা আনবে?<br />
জ্বালানির প্রশ্নটিও তো বিবেচ্য বিষয়। বিদেশি কোম্পানির গ্যাসের ওপর জোর বাড়ছে। দেশীয় কোম্পানিকে উপেক্ষা করা হচ্ছে। শেভরন, কেয়ার্ন নানা রকম ছাড় পাচ্ছে। কর রেয়াত চাইছে। থার্ড পার্টির কাছে গ্যাস বিক্রির অনুমতি পাচ্ছে। এসব কিসের লক্ষণ?<br />
ফুলবাড়ীতে এশিয়া এনার্জির কয়লা তুলবার জন্য হা করে দাঁড়িয়ে আছে একদল। পরিবেশ প্রতিবেশ তাদের কাছে বিবেচ্য নয়। এই দলে মহাজোটের বড় বড় চাঁইরা মিলেছেন। হালে পেশাজীবী-বুদ্ধিজীবীরা ভোলপাল্টে এশিয়া এনার্জির মিত্র সেজেছেন।<br />
জনস্বার্থের পক্ষত্যাগী এই স্বার্থপর বুদ্ধিবৃত্তিক আচরণ ভবিষ্যতে দেশের বিদ্যুৎ খাতকে বিপজ্জনক পরিণতির দিকে নিয়ে যাবে।<br />
সরকারের মধ্যে এখন অনেক সরকার। এদের দৃষ্টিভঙ্গিও নানা রকম। নিচের তিনটি উদ্ধৃতি সেই আশঙ্কা এবং বিপদকে স্মরণ করিয়ে দেয়।</h3>
<h3>ক.<br />
‘পরিবেশ এবং জনসাধারণের স্বার্থকে অগ্রাধিকার দিয়ে সরকার কয়লা উত্তোলনের ব্যাপারে সিদ্ধান্ত নেবে, তাড়াহুড়ো করে কিছুই করা হবে না।<br />
বাংলাদেশে যথেষ্ট কয়লা রয়েছে। কিন্তু অন্যান্য দেশের চিত্র আমাদের থেকে ভিন্ন। বাংলাদেশের ঘনবসতি, সার্বিক পরিবেশ, কয়লা উত্তোলনের পর ভূমি ভরাট ও মানুষের ক্ষয়ক্ষতি ইত্যাদি বিষয়ে বিবেচনায় রেখেই আমাদের সিদ্ধান্ত নিতে হবে।’<br />
Ñ প্রধানমন্ত্রী শেখ হাসিনা<br />
(প্রধানমন্ত্রীর কার্যালয়ে জাতীয় বিজ্ঞান ও প্রযুক্তি পরিষদের ষষ্ঠ সভায় প্রধানমন্ত্রী এ কথা বলেন।  সূত্র : জনকণ্ঠ, ২৮ জুন ২০১০)</h3>
<h3>খ.<br />
‘বিদ্যুতের সমস্যার স্থায়ী সমাধানের জন্য আমাদের নির্ভর করতে হবে মাটির তলায় সঞ্চিত কয়লা বা আমাদের কালো সোনার ওপর। বাংলাদেশকে বাঁচাতে হলে উন্মুক্ত পদ্ধতিতে কয়লা উত্তোলন ও কয়লাভিত্তিক বিদ্যুৎ উৎপাদনের কোনো বিকল্প নেই। বাস্তবতা বর্জিত দায়িত্বহীন কিছু লোকের মায়াকান্নার জন্য উন্মুক্ত পদ্ধতিতে কয়লা উত্তোলন থেকে বিরত থাকা হবে উন্নয়নবিরোধী আত্মঘাতী সিদ্ধান্ত। আমি প্রধানমন্ত্রী হলে নির্দেশ জারি করব যেখানে যেখানে সম্ভব আজ থেকেই উন্মুক্ত পদ্ধতিতে কয়লা উত্তোলনের কাজ শুরু হবে।’<br />
Ñ নূহ-উল-আলম লেনিন<br />
প্রচার সম্পাদক, বালাদেশ আওয়ামী লীগ<br />
(তথ্য সূত্র : ‘আমি যদি একদিনের জন্য প্রধানমন্ত্রী হতাম’ শিরোনামে প্রকাশিত উপ-সম্পাদকীয়, দৈনিক ইত্তেফাক, ২৯ জুন ২০১০)<br />
গ.<br />
‘বিশ্বব্যাংক এবং পিডিবি (বিদ্যুৎ উন্নয়ন বোর্ড) হিসেব করে দেখেছে, প্রতি ইউনিট বিদ্যুৎ না দিলে দেশের অর্থনীতির ক্ষতি হচ্ছে ৩০ টাকা। অথচ সরকার ভাড়ার বিদ্যুৎ কেন্দ্রগুলোর কাছ থেকে সর্বোচ্চ ১৫ টাকা দিয়ে প্রতি ইউনিট বিদ্যুৎ কিনছে, যা প্রতি ইউনিট বিদ্যুতের অর্থনৈতিক ক্ষতির অর্ধেক।’<br />
Ñআলমগীর কবির<br />
চেয়ারম্যান, পিডিবি<br />
(বিদ্যুৎ সমস্যা এবং রফতানির ওপর প্রভাব শীর্ষক ডাচ-বাংলা চেম্বার অব কমার্স এ্যান্ড ইন্ডাস্ট্রিজ আয়োজিত বৈঠকে ॥ সূত্র : যুগান্তর, ২৫ জুন ২০১০)<br />
প্রধানমন্ত্রী জনগণের ক্ষয়ক্ষতির কথা বিবেচনা করে কয়লা তোলার কথা বলছেন। আওয়ামী লীগের প্রচার সম্পাদক তা মানতে রাজি নন। তার বিবেচনা জাহান্নামে যাক পরিবেশ-প্রতিবেশ। পিডিবির চেয়ারম্যান, আরো এক কাঠি এগিয়ে অর্থনীতির সরল অঙ্কেই তিনি বিদ্যুতের দামের কথা ভাবছেন। বিদ্যুতের দাম প্রতি ইউনিট ১৫ টাকা হলে সামগ্রিক অর্থনীতিতে তার প্রভাব কি পড়বে? যে ৭০ শতাংশ মানুষের ঘরে এখনো বিদ্যুৎ যায়নি তার ওপর এর প্রভাব কি পড়বে?<br />
নিত্যপ্রয়োজনীয় দ্রব্যাদির ওপর, দেশীয় শিল্প-কারখানার ওপর এর অভিজ্ঞতা কি পড়বে?<br />
এগুলো বিবেচনায় না রাখলে, কুইক রেজাল্টকেই সমাধান মনে হবে।<br />
পিডিবির মতো পাবলিক প্রতিষ্ঠানকে ধ্বংস ধরে যাকেতাকে ধরে এনে বিদ্যুৎ ব্যবসায়ী বানাতে হবে।<br />
এই আত্মধ্বংসী পথ অচিরেই বিপর্যয় আনবে। তাই দ্রুত এসব আত্মবিনাশী পথ ছাড়ার উপায় বাতলাতে হবে। পিডিবিকে শক্তিশালী করা দরকার। পিডিবির দক্ষ জনশক্তির আত্মবিশ্বাস, আস্থা ফিরিয়ে আনতে হবে। পিডিবিতে গ্যাস সরবরাহ, আর্থিক প্রণোদনা জুগিয়ে পিডিবির উৎপাদন ব্যবস্থা বাড়াতে হবে। সরকারি প্রতিষ্ঠানের সক্ষমতা নষ্ট করার মধ্যে ব্যক্তি, গোষ্ঠী স্বার্থ থাকতে পারে কিন্তু তাতে জনস্বার্থ ধ্বংস হয়। এই বিষয়টি সবাইকে অনুধাবন করতে হবে।<br />
অধ্যাপক আনু মুহাম্মদ<br />
আমি গতকালই মালয়েশিয়া থেকে এসেছি। ৩ দিনের একটা কনফারেন্সে গিয়েছিলাম। যা মালয়েশিয়ার সোসালিস্ট পার্টি কর্তৃক আয়োজিত হয়েছিল। সেখানে আমার একটা বিশেষ আগ্রহ ছিল মালোয়েশিয়ার তেল-গ্যাস বিষয়ক জাতীয় সংস্থা পেট্রনাস নিয়ে। বাংলাদেশে মালয়েশিয়া নিয়ে উচ্ছ্বাস আছে যে আমাদের মালয়েশিয়ার মতো হওয়া উচিত এবং মালয়েশিয়ার মতো উন্নয়ন করতে হবে। অনেকে স্যুভেনির হিসেবেও নিয়ে আসেন মালয়েশিয়ার টুইনটাওয়ার।  নিউয়র্কে টুইনটাওয়ার ধ্বংসের পরে এখন পৃথিবীতে একমাত্র টুইনটাওয়ার হচ্ছে মালয়েশিয়ায় কুয়ালালামপুরে। মালয়েশিয়া টুইনটাওয়ার নির্মাণ করেছে আমাদের দেশে সেটা নিয়ে উচ্ছ্বাস বেশি। কিন্তু টুইনটাওয়ারটা মূলত হচ্ছে মালয়েশিয়ায় অর্থনৈতিক শক্তির একটা প্রকাশ। টুইনটাওয়ারটাই হচ্ছে পেট্রনাসের ভবন, পেট্রনাসের হেডকোয়ার্টার হচ্ছে টুইনটাওয়ার। পেট্রনাসের শক্তির ওপর দাঁড়িয়েই, কিন্তু টুইনটাওয়ারের মতো একটি ভবন নির্মাণ করা যাচ্ছে। শক্তি মানে আর্থিক শক্তি, তার সক্ষমতা ইত্যাদি।<br />
পেট্রনাস প্রতিষ্ঠিত হয় ১৯৭৪ সালে। পেট্রোবাংলাও প্রতিষ্ঠিত হয় একই সময়ে। পেট্রনাস হচ্ছে সম্পূর্ণ জাতীয় একটি প্রতিষ্ঠান। জাতীয় প্রতিষ্ঠান হিসেবে মালয়েশিয়ায় সকল গ্যাস-তেল উত্তোলন, বিতরণ এবং সেটার চৎড়পবংংরহম পেট্রো-কেমিক্যাল কমপ্লেক্স সমস্ত কিছুর দায়িত্ব হচ্ছে পেট্রনাসের এবং তার সঙ্গে অনেক সাবসিডিয়ারি প্রতিষ্ঠান আছে। পুরো একটা সেক্টরের ওপর তার কর্তৃত্ব।<br />
বর্তমানে মালয়েশিয়ায় জিডিপির শতকরা ৪০ ভাগেরও বেশি পেট্রনাসের কর্তৃত্বাধীন। মালয়েশিয়ার অর্থনীতির যে শক্তি তার প্রধান ভিত্তিটা নির্মাণ করা হয়েছে জ্বালানি খাতকে কেন্দ্র করে। শুধু পেট্রনাসের মতো একটা প্রতিষ্ঠান গড়ে তোলার কারণে। কথাটা বলেন না। তারা সব সময় বলেন, মালয়েশিয়ায় বিদেশি বিনিয়োগ হচ্ছে আমাদেরও বিদেশি বিনিয়োগ করতে হবে। মালয়েশিয়ায় যে সমস্ত বিদেশি বিনিয়োগ এখন হচ্ছে সেই সমস্ত বিদেশি বিনিয়োগ তাদের মাধ্যমে যৌথ মালিকানার ভিত্তিতে আসতে হয়।<br />
পেট্রনাসের সঙ্গে বিদেশি বিনিয়োগকারীদের যে সম্পর্ক সেখানে শতকরা ৮০ ভাগের মালিকানা হচ্ছে মালয়েশিয়ার। অন্যদের কাজগুলো হচ্ছে সেগুলো সাবসিডিয়ারি। বর্তমানে পেট্রনাস বিশ্বের ২০টা দেশে নিজেই ওহাবংঃসবহঃ করে। বিশ্বের বিখ্যাত বহুজাতিক কোম্পানিগুলোর মধ্যে পেট্রনাস এখন অন্যতম।<br />
বিশ্বব্যাংক এবং পিডিবি হিসেব করে দেখেছে প্রতি ইউনিট বিদ্যুৎ না পেলে দেশের অর্থনৈতিক ক্ষতি হচ্ছে দৈনিক ৩০ টাকা। এখন বিশ্বব্যাংকের সিদ্ধান্ত হলো ১৫ টাকা করে যদি বিদ্যুৎ কেনা যায় তাহলে অসুবিধা কী? বিশ্বব্যাংকের গত দুই-তিন দশকের বিভিন্ন হিসাব এবং হিসাব থেকে বিভিন্ন সাজেশনের কারণে আজকে পেট্রনাস থেকে পেট্রোবাংলা সম্পূর্ণ বিপরীত দিকে যাত্রা শুরু করেছে। পেট্রনাস একই সময়ে প্রতিষ্ঠিত হয়েও একটা শক্তিশালী অবস্থানে পৌঁছেছে, অন্যদিকে পেট্রোবাংলা একটা লোকসানী প্রতিষ্ঠানে পরিণত হচ্ছে। বিশ্বব্যাংক ইতোমধ্যে একটা ফাইল তৈরি করেছে এবং সেটা একবার পাঠানো হয়েছিল, পরে আপাতত স্থগিত রাখা হয়েছে। যুক্তিটা হচ্ছে পিডিবি খুবই লোকসানী প্রতিষ্ঠান, পেট্রোবাংলা লোকসানী প্রতিষ্ঠান। সুতরাং এদেরকে আস্তে আস্তে ভেঙে ফেলা হোক। এমনিতে ভেঙে অনেকগুলো টুকরো করা হয়েছে, এখন সম্পূর্ণটা বিলুপ্ত করার মতো অবস্থা। কিন্তু পেট্রবাংলা কি কারণে লোকসানী প্রতিষ্ঠানে পরিণত হয়েছে? হয়েছে বিশ্বব্যাংকের বিভিন্ন ধরনের ফিজিবিলিটিজ স্টাডিজ ও প্রেসক্রিপশন এবং তার মধ্যে সরকার যে নীতিগুলো নিয়েছেÑ তার কারণে।<br />
তার মধ্যে একটি হচ্ছে গ্যাস খাতের। বিদেশিদের হাতে দেশের গ্যাস ক্ষেত্র তুলে দেয়া। তুলে দেয়ার কারণে আমাদের পেট্রোবাংলার ভর্তুকি হিসেবে বাড়তি খরচ হচ্ছে প্রায় ২ হাজার কোটি টাকারও বেশি।<br />
বিদেশি কোম্পানির বিদ্যুৎ উৎপাদনের জন্য এবং সেই বিদ্যুৎ বর্ধিত দামে কেনার জন্য এখন দেড় হাজার কোটি টাকারও বেশি ভর্তুকি দিতে হচ্ছে পিডিবিকে। এ বছরে জ্বালানি খাতে বরাদ্দ নিয়ে আমাদের বাজেট নিয়ে আলোচনার বিতর্কের মধ্যে আমাদের সমস্ত মনোযোগ নিবদ্ধ থাকে। কিন্তু বরাদ্দের অর্ধেকটা কিসের জন্য এই বিশ্লেষণটা খুব কম আসে। জ্বালানি  খাতে যে বরাদ্দটা এখন পর্যন্ত হয়ে আসছে তার ৮০% হচ্ছে বিদেশি কোম্পানির কাছ থেকে ভর্তুকি বাবদ। গ্যাস এবং বিদ্যুৎ কেনার জন্য যে ভর্তুকি দিতে হয় সেই  ভর্তুকির টাকাই হচ্ছে জ্বালানি খাতের প্রধান বরাদ্দ। এ বছর যে বরাদ্দ বৃদ্ধি পেয়েছে সেটার প্রধান কারণ হচ্ছে ঐ কুইক রেন্টাল নামে যেসব চড়বিৎ চষধহঃ গুলো করা হচ্ছেÑ যে পাওয়ার প্ল্যান্টে ১২, ১৪, ১৫, ১৬ টাকার বেশি দামে আমাদের প্রতি ইউনিট বিদ্যুৎ কিনতে হচ্ছে।<br />
যার জন্য কয়েক বছরে প্রায় ৭ হাজার কোটি টাকা ভর্তুকি দিতে হবে। সেই টাকাই এবারের বাজেটে ভর্তুকির জন্য বরাদ্দ হিসেবে জ্বালানি খাতে রাখা হয়েছে। জ্বালানি খাতে বর্ধিত বরাদ্দ মানে উন্নয়ন, পিডিবিকে শক্তিশালী করা বা জাতীয় সক্ষমতা বাড়ানোর জন্য নতুন নতুন প্রশিক্ষণ কেন্দ্র, গবেষণা প্রতিষ্ঠান, বিশ্ববিদ্যালয় স্থাপন তা নয়ই এটা হচ্ছে বিদেশি কোম্পানির হাতে তুলে দেয়া। তারই ধারাবাহিকতা হচ্ছে বিদ্যুতের দাম বৃদ্ধি, গ্যাসের দাম বৃদ্ধি। কয়েকদিন আগে অর্থমন্ত্রী নিজেই বলেছেন যে বিদ্যুতের দাম বাড়াতে হবে আমাদেরকে। কারণ বিদ্যুৎ খাতে যে বিদেশি বিনিয়োগকারী আছে তাদেরকে আকর্ষণ করার জন্য। তাদের মূল লক্ষ্যটা হচ্ছে সেটা।<br />
বিদ্যুৎ খাতে বিদেশি বিনিয়োগকারীদের আকর্ষণ করতে তাদের মুনাফা নিশ্চিত করার  জন্য আমাদের বিদ্যুতের দাম বাড়াতে হবে।<br />
বিদ্যুতের দাম বৃদ্ধির মানে কী? বিদ্যুতের দাম বৃদ্ধির মানে হচ্ছেÑ ১ টাকা যদি বিদ্যুতের দাম বাড়ে সেটা ৫২ টাকা পর্যন্ত তার ফলাফল বা চাপ অর্থনীতিতে বিভিন্ন ক্ষেত্রে পড়তে পারে। যেটাকে অর্থনীতির ভাষায় বলা হয় মাল্টিপ্লায়ার ইফেক্ট।<br />
বিশ্বব্যাংকের একটা কথা সব সময় আপনারা শুনে থাকেন জধঃরড়হধষরুধঃরড়হ ড়ভ চৎরপবং বলে যৌক্তিকীকরণ। পত্রপত্রিকায়সহ লেখা হয়Ñ কারো দাম  যৌক্তিকীকরণের কথা বলা হয়েছে। দাম বাড়ানোর কথা বলা হয়েছে। গ্যাসের দাম যখন  সব কিছুর দাম বাড়ানোই হচ্ছে তাদের জধঃরড়হধষরুধঃরড়হ। কমতি আছে, একটাতেই সেটা শ্রমশক্তির দাম বা মজুরি। শুধুমাত্র শ্রমশক্তির ক্ষেত্রে যদি বলে জধঃরড়হধষরুধঃরড়হ তাহলে তারা বোঝায় মজুরি কমানোর জন্য আর সব ক্ষেত্রেই বাড়ানোর কথা বলে।<br />
বাড়ানোর ফলে অর্থনীতিতে যে চাপটা তৈরি হয় তাহলে সরকার ভতুর্কি দেয়। কিন্তু সরকারের তো কোনো টাকা নেই। জনগণের টাকা দিয়ে তারা ভুর্তকি দেয়। এখন কথা হচ্ছে জনগণের টাকা দিয়ে ভর্তুকি কাকে দেয়া হবে, কে পাবে? সেই ভতুর্কির টাকা পেতে পারে যার ভূমিকার কারণে জনগণের বর্তমান ও ভবিষ্যতের স্বার্থ রক্ষিত হয়। সুতরাং পিডিবি তার নিজস্ব চড়বিৎ চষধহঃ প্রতিষ্ঠা করতে গিয়ে যদি ভর্তুকি পায় সেটার সুবিধা ভবিষ্যৎ জেনারেশন পাবে। কিন্তু তা যদি পায় আমেরিকান অথবা বিদেশি কোনো কোম্পানি সেটা হবে জনগণের পক্ষে পকেট কাটার শামিল। জনগণের পকেট কাটা গেলে উৎপাদনশীল তৎপরতা কখনো সমৃদ্ধ হবে না।<br />
১৯৯৬ সালের প্রাইভেট সেক্টর পাওয়ার জেনারেশন পলিসি যেটা বিশ্বব্যাংক তৈরি করেছিল এই কথাকথিত উন্নয়নের কথা বলেই। এই পাওয়ার জেনারেশন পলিসির মাধ্যমেই বিপর্যয়ের সূত্রপাত। তারপর থেকে বাংলাদেশে রাষ্ট্রীয়ভাবে বিদ্যুৎ প্লান্ট করা হয়নি।<br />
রাষ্ট্রীয়ভাবে প্লান্ট করা হলে কি হয়? রাষ্ট্রীয়ভাবে প্লান্ট করলে প্রতি ইউনিট বিদ্যুতের দাম পড়ে ২ টাকারও কম। প্রায় ১.৬০ টাকা। সেখানে কুইক রেন্টাল নিচ্ছে প্রতি ইউনিট ১৪, ১৫ ও  ১৬ টাকা। রাষ্ট্রীয়ভাবে বিদ্যুৎ উৎপাদনের প্রচেষ্টা বন্ধ হয়ে গেল কেন? গ্যাস উৎপাদনের ক্ষেত্রেও বাংলাদেশের ক্ষমতার সম্প্রসারণ সেটাও বন্ধ হেয় গেল। ’৯০-এর দশকের প্রথম থেকেই তারপর গ্যাস ক্ষেত্র চলে গেল বহুজাতিক কোম্পানির হাতে। বিদ্যুৎ খাতে ক্রমাগত এ অবস্থা বাড়ছে। এটা এখন শতকরা ৫০% হয়ে গেছে। যত তাদের সঙ্গে চুক্তি বাড়বে তত আমাদের উপর ভার বাড়বে।<br />
গ্যাস-বিদ্যুতের দাম বৃদ্ধির মাধ্যমে এক দফা ভতুর্কির মাধ্যমে দায় বাড়বে। অর্থাৎ ভর্তুকি ও দাম বাড়ার মাধ্যমে অর্থনীতি ব্যয়বহুল হবে। এ রকম একটা অবস্থার মধ্যেই আমরা বর্তমানে প্রবেশ করেছি। মাগুরছড়ায় আমরা যে গ্যাস হারিয়েছি আন্তর্জাতিক বাজার থেকে তা কিনতে হলে আমাদের ৩৫ হাজার কোটি টাকা লাগবে। যা এ বছরের বাজেটের বার্ষিক উন্নয়ন কর্মসূচির সমান।<br />
এই ৩৫ হাজার কোটি টাকা হলো বর্তমান জ্বালানি খাতে যে বরাদ্দ দেয়া হচ্ছে তার ৫ গুণ বেশি। এই যে ক্ষতিপূরণের টাকা তা কে আদায় করবে? আমরা দেখতে পাচ্ছি ১৯৯৭-৯৮ সালের পর থেকে এ পর্যন্ত কোনো সরকার ক্ষতিপূরণ আদায়ের জন্য চেষ্টা করেনি। পিডিবির যদি লোকসান হয় বিশ্বব্যাংক লাফাতে থাকে, পেট্রোবাংলার যদি তাদের নীতির কারণে লোকসান হয় বিশ্বব্যাংক লাফাতে থাকে। কিন্তু যে শেভরণ, নাইকোর জন্য বাংলাদেশের ৩৫ হাজার কোটি টাকার পরিমাণ ক্ষতি হলোÑ সেই ক্ষতি পূরণ আদায়ের জন্য কিন্তু বিশ্বব্যাংক একটা কথাও বলেনি। এটাই হলো আমাদের উন্নয়ন সহযোগীদের ভূমিকা। অথচ আমাদের জ্বালানি মন্ত্রণালয় এর উদ্যোগেÑ কেয়ার্ন এনার্জি, শেভরণের কাছ থেকে ক্ষতিপূরণ আদায় না করে তাদের কে বিবিয়ানার পাশে আরো বিস্তৃত অঞ্চল দেয়া হয়েছে। লাউয়াছড়ায় তারা আরেক সর্বনাশ করতে যাচ্ছে কিন্তু সেজন্য কোনো প্রতিবন্ধকতা সৃষ্টি করা হচ্ছে না। এর মধ্যে আবার কর রেয়াত।<br />
এমনিতেই তো তারা কর দেয় না। তাদের যে কর দেয়ার কথা করপোরেট ট্যাক্স। এই ট্যাক্সটা দেয়া পেট্রোবাংলা। বহুজাতিক কোম্পানির ট্যাক্স দেয় পেট্রোবাংলা। জাতীয় রাজস্ব বোর্ড বা এনবিআর হিসেবে দেখায় যে প্রথক পাঁচটি বৃহৎ কর প্রদানকারী সংস্থার মধ্যে শেভরনের নাম লেখে কিন্তু সেই শেভরন নিজে সে কর দেয়নি। পেট্রে বাংলা দিয়েছে। এ রকম একটা বিভ্রান্তি সৃষ্টি করে তারা যে প্রতিষ্ঠানগুলোকে উন্নয়নকামী প্রতিষ্ঠান হিসেবে দেখায় তারা লুণ্ঠনকারী ছাড়া আর কিছুই নয়।<br />
আমরা দেখতে পাচ্ছি গত কিছুদিন ধরে স্বৈরশাসক হুসেইন মুহম্মদ এরশাদ এবং তার প্রথম অর্থ উপদেষ্টা বর্তমান অর্থমন্ত্রী আবুল মাল আবদুল মুহিতসহ বেশ কিছু সরকারি মন্ত্রী উন্মুক্ত খনন পদ্ধতির মাধ্যমে কয়লা উত্তোলনের জন্য প্রচার কাজে অংশ নিচ্ছেন।<br />
সারাদেশের মানুষের সর্বনাশ করে যারা উন্মুক্ত খনন পদ্ধতির প্রস্তাব করছেন, চেষ্টা করছেন তার মধ্যে এশিয়া এনার্জি আছে, ভারতের টাটা আছে, আছে তাদের কমিশনভোগী দেশের এজেন্টরাÑ তাদের উদ্দেশে আমরা স্পষ্ট করে বলে দিতে চাইÑ বাংলাদেশের জনগণের যে ঐক্য, দৃঢ়তা, চেতনা সেটা থেকে আমরা নিশ্চয়তা দিচ্ছি বাংলাদেশের জনগণ কোনো দিন, কোনোভাবে, কোনো কাজে, কোনো কৌশলে, কোনো চক্রান্তে উন্মুক্ত খনন পদ্ধতির নামে দেশের সর্বনাশ করতে দেবে না।</h3>
<h3>প্রকৌশলী বি ডি রহমতুল্লাহ<br />
বাংলাদেশে আজকে যে বিদ্যুৎ খাত তা বিকৃত বিদ্যুৎ বা জ্বালানি খাত আজকে যে বিকৃত তাতে রাষ্ট্রীয় নিরাপত্তাও কিন্তু বিঘিœত। রাষ্ট্রীয় উন্নয়ন যদি না ঘটে তাহলে রাষ্ট্রের তো আর কোনো নিরাপত্তা থাকে না। কাজেই আজকে বিদ্যুৎ খাতকে সাগরের এমন এক কিনারে ফেলে দেয়া হয়েছে আরেকটু ধাক্কা দিলেই এটা পড়ে যাওয়ার মতো অবস্থা। সেই অবস্থায় রক্ষক হিসেবে যাদেরকে দাঁড় করানো হয়েছে তারা হচ্ছে এ দেশের এবং বিদেশের কিছু মাফিয়া, যারা রেন্টাল বিদ্যুৎ নামে এসেছে।<br />
রেন্টালের ইতিহাসটা বলার আগে বলব এ দেশে আমাদেরকে পরামর্শ দেয়ার জন্য, ক্ষতি করতে যারা এসেছে তারা হলো বিশ্বব্যাংক। ১৯৯৪ সালে তারা যখন একটি সুপারিশমালা দেয় সেখানে প্রথম কথাটিই ছিল বিদ্যুৎ খাতকে পর্যায়ক্রমে বেসরকারিকরণ করতে হবে।<br />
বিশ্বব্যাংকের পরামর্শ আমাদের বিদ্যুৎ সরবরাহ ব্যবস্থাপনাকে ক্রমশ টুকরো টুকরো করা হয়েছে। ডেসা, ডেসকো কিংবা ডিপিডিসি বানানো হয়েছে। এই যে ছোট করা হলো তার প্রধান কারণ হলো সংস্থাকে যত ছোট করা হবে তার বার্গেনিং কেপাসিটি ততই কমবে। ততই তার ওপর শর্ত চাপানো যাবে।<br />
প্রতি ইউনিটে পিডিবি এ বছর যে দামে বিদ্যুৎ কিনেছে তা বিক্রিতে প্রতিইউনিটে ৬১ পয়সা লস। যার লসের পরিমাণ গত বছর ছিল প্রায় ১৮শ কোটি টাকা। এই লস বৃদ্ধি কিন্তু হতেই থাকবে। রেন্টালকে জাস্টিফাই করার জন্য তারা বলছে বিদ্যুৎ না থাকলে অর্থনৈতিক ক্ষতি ৩০ টাকা। অর্থা ৩০ টাকাই লস। সুতরাং আমি ১৫ টাকায় দেব। অর্থাৎ তোমাকে খুন করে ফেলব আমার ২টা হাত কেটে দিন। অর্থাৎ আমাকে অচল করে দেয়ার একটা পদ্ধতি। এভাবেই পিডিবির বর্তমান চেয়ারম্যান আলমগীর কবির কুইক রেন্টাল বিদ্যুৎ কেনার বিষয়টি জাস্টিফাই করছেন।<br />
আগামী বছর কুইক রেন্টালের নামে ৫ হাজার মেগাওয়াট বিদ্যুৎ উৎপাদন করা হবে যার জন্য সরকারকে ৮ হাজার কোটি টাকা ভর্তুকি দিতে হবে।</h3>
<h3>প্রকৌশলী আমানুল ইসলাম চৌধুরী<br />
ভারতের সঙ্গে যে চুক্তির বিষয়টা সেটা বর্তমান সরকার পূর্ণবিবেচনা করে দেখা উচিত। কারণ এটা আমার কাছে দুঃস্বপ্ন লাগে। যৌথ মালিকানায় খুলনাতে বড় বিদ্যুৎ কেন্দ্র স্থাপন করা হবে। যৌথ মালিকানা ভয়ের ব্যাপার। কয়লাভিত্তিক বিদ্যুৎকেন্দ্র হবে। এখন এই কয়লা কোথা থেকে আসবে? কয়লা আমদানি করতে হবে। কয়লা আনতে গিয়ে যেসব ঝামেলা হয় সে বিষয়ে কারো কোনো অভিজ্ঞতা আছে কি? আমি দীর্ঘকাল রেলওয়েতে চাকরি করেছিলাম। আমাদের কিছু  পাওয়ার প্ল্যান্ট ছিল কয়লাভিত্তিক কয়লা আমরা ভারত থেকে আনতাম। এই কয়লা আনতে কি যে ঝামেলা। বলে বুঝতে পারব না। তার পরও কয়লা আসবে সেই কয়লা দিয়ে আমরা বিদ্যুৎ জ্বালাব। ভারতের কোনো কোম্পানি সেটার মুনাফা নিয়ে চলে যাবে। কেন সেটা হবে? কতদিন থেকে আমরা মার খাব।<br />
আলোচনার প্রস্তাবনায় আরেকটি বিষয় উল্লেখ হয়েছে, ভারতের বহরমপুর থেকে যে বিদ্যুৎটা আসবে সেটার লাইন চার্জ আমরা কিভাবে তিরিশ বছরে পরিশোধ করব। কিন্তু সবচেয়ে ভয়ঙ্কর কথা হচ্ছে হুইলিং চার্জ। পশ্চিম বাংলায় দেখা যায় সরকার তাদের নিজেদেরকেই বিদ্যুৎ দিতে পারছে না। তাদের পত্রিকা দেখলেই বোঝা যাবে যে তাদের ওখানে মারামারি হচ্ছে, গণ্ডগোল হচ্ছে বিদ্যুতের অভাবে। তাই তারা আমাদেরকে বিদ্যুৎ দিতে পারবে না। বিদ্যুৎ আসবে উড়িষ্যা অথবা বিহার থেকে। যেখানে বিদ্যুৎ তারা বিক্রি করতে পারছে না। হুইলিং চার্জের নাম করে তারা আমাদের কাছ থেকে ঐ দূরত্বের হিস্যাটা আদায় করে নেবে। এরপর তো ডলার এক্সচেঞ্জের ব্যাপার আছেই। তাই বিষয়গুলো আবার ভালোভাবে খতিয়ে দেখা দরকার বলে মনে করি আমি।</h3>
<h3>অধ্যাপক আবু আহমেদ<br />
বিদ্যুৎ নিয়ে আমরা খুব অন্ধকারের দিকে যাচ্ছি। কম্পিটিটিভ সিস্টেম আছে না? কম্পিটিটিভ সিস্টেমে যাওয়ার পরে সরকার যদি কথাটা বলত এখন এভাবে বিদ্যুৎ নিলে আমাদের অনেক লাভ। এখানে ৭ টাকা করে দিলে আমাদের এক ধরনের লাভ হবে, ১৪ টাকা করে দিলে আরেক ধরনের লাভ হবে। অথচ এ রকম কথা নেই। কোনো রকম প্রতিযোগিতা ছাড়াই এসব বিদ্যুৎ কেনা হচ্ছে। দরপত্রহীন বিদ্যুৎ কেন্দ্র। গ্যাসের ক্ষেত্রেও সরকার বিদেশিদের ছাড় দিচ্ছে। পেট্রোবাংলা আবার থার্ড পার্টি আইন তৈরি করেছে। আমাদের একটা প্রশ্নের জবাব কেউ দিচ্ছে না। দেখেন থার্ড পার্টির কাছে বিদেশি গ্যাসে কোম্পানিগুলো গ্যাস বিক্রি করলে সরকার যে নেগোশিয়েট প্রাইজটা আগে ঠিক করেছিল ৩, ৪টা ফর্মুলা দিয়া সেটা থাকবে কি না?<br />
অন্যদিকে আইওসিগুলো যদি মার্কেটে ডিমান্ড সাপ্লাইয়ের মাধ্যমে বিক্রি করে পরবর্তীতে তাহলে আমার দেশের প্রাইভেট সেক্টর বাধ্য হচ্ছে ওদের কাছে থেকে গ্যাস নিতে। তাহলে তো কস্ট অব প্রডাকশন বাড়বে না? দেশের ক্ষতিটা হচ্ছে না?<br />
কয়লা খনি নিয়ে আবার কথা হচ্ছে। সরকার লোকজনকে জার্মানিতে পাঠাচ্ছে কয়লা উত্তোলন সিস্টেম দেখার জন্য তাদের প্রশ্ন করি ঐ খানে মানুষ থাকে কি না? এই কথা মিডিয়া ভালো করে লেখে না। মিডিয়া লেখে জার্মানিতে উন্মুক্ত কয়লা উত্তোলন পদ্ধতি সাকসেসফুল। সেখানে ওনারশিপটা দেখছে কি না, সেখানে এশিয়া এনার্জি কয়লা ব্যবহার করছে না জার্মান জনগণ ব্যবহার করছে?<br />
ওইখানে তো মানুষ থাকে না। সুতরাং উন্মুক্ত কয়লা খনি হলে জার্মানিতে সমস্যা নেই। আমাদের দেশে কয়লা খনির আশপাশে তো মানুষ থাকে। আশা করি এসব দালালচক্র থেকে সরকার দূরে থাকবে।<br />
আমাদের দেশের ইকোনমিস্টরা যারা ভারতের সঙ্গে ভালো সম্পর্ক রাখতে চায় তাদের দ্বারাও একটা কস্ট বেনিফিটেড এনালাইসিস করে জাতির সামনে পেশ করুন না যে ভারত থেকে বিদ্যুৎ আনলে এত খরচ পড়বে, আমার দেশে উৎপাদন করলে এত খরচ পড়বে। কস্ট বেনিফিট এনালাইসিস ছাড়া কোন পাগল কি আছে দুটো মেথডের জন্য কত মাইল গ্রিড লাইন আমাকে বসাতে হবে সেটা বলতে পারে। ২৫০ মেগাওয়াট বিদ্যুৎ আনা হবে ইন্ডিয়া থেকে। আমি মনে করি যদি ভারত থেকে বিদ্যুৎ আনাই হয় তাহলে সেটার কস্ট বেনিফিট এনালাইসিস করা উচিত ইন্ডিপেনডেন্টলি। আমাদের যে সংসদীয় স্ট্যান্ডিং কমিটি আছে সেখানে আলোচনা করে জাতিকে জানাতে হবে। স্ট্যান্ডিং কমিটিতে অনেক কিছু আলোচনা হয়, কিন্তু এসব বিষয় কখনো ভালো করে আলোচনা হয়েছে বলে আমার জানা নেই। ভারত থেকে যে বিদ্যুৎ আনছি এটা কি শর্তে? আপনারা কি কখনো শুনেছেন? আমি তো দেখি না। আমাদের জনপ্রতিনিধিরা আলোচনা করে জাতিকে জানাতে পারেÑ শর্তগুলো জানাতে পারে?<br />
ব্রিটিশ পেট্রোলিয়াম ম্যাক্সিকো উপসাগরে যে কাণ্ডটি ঘটাল তার জন্য ৩ মিলিয়ন ডলার জরিমানা দিচ্ছে। ওদের শেয়ারের দাম অর্ধেকে নেমে গেছে লন্ডন স্টক একচেঞ্জ এবং নিউয়র্ক স্টক একচেঞ্জে। অথচ এই যে নাইকো আমাদের গ্যাস পোড়ালো আমরা দুটো পয়সা পাইনি। সেখান থেকে তারা গ্যাস তুলে নিয়ে আবার আমাদের বিরুদ্ধে মামলা করেছে। আমাদেরকে কীভাবে ব্ল্যাক মেইল করছে?</h3>
<h3>কাজী ফারুক<br />
আজকে আমরা একটি প্রতিনিধিত্বশীল বিশ্বে বসবাস করছি। এখানে বার্গেনিং ক্যাপাসিটিটা হচ্ছে সবচেয়ে বড়। আমাদের যারা এসব বিষয় নিয়ে বার্গেনিং করতে যান তারা কতটুকু দেখে, শুনে, পড়ে, বুঝে দেশ ও জাতির স্বার্থ সংরক্ষণের জন্য কথা বলেন সেটা সম্পর্কে আমার যথেষ্ট সন্দেহ আছে।<br />
দিনে দিনে আমরা কোন দিকে যে ধাবিত হচ্ছিÑ কোন দামে বিদ্যুৎ কিনতে হবে সেটা বড়ই কঠিন একটা প্রশ্ন। গত পরশু আমরা গ্যাসের দাম বাড়ানোর কথা শুনলাম। এনার্জি রেগুলেটরি কমিশনের চেয়ারম্যান বললেন কিছু একটা করবেন। কিন্তু তিনি কতটুকু করতে পারবেন সেটা সমন্ধে আমার সন্দেহ আছে। কমিশন করে দাম কমানো যে অর্থে করা উচিত আমরা কিন্তু সে অর্থে কমিশন দেখতে পাচ্ছি না। যেমন বিটিআরসির ক্ষমতা খর্ব করা হয়েছে যে কোনো মুহূর্তে এনার্জি রেগুলেটরি কমিশনের ক্ষমতাও খর্ব করা হবে।<br />
ইদানীং দেখা যাচ্ছে অর্থমন্ত্রী একই সঙ্গে বিদ্যুৎমন্ত্রীর ভূমিকায় অবতীর্ণ। এ বিষয়গুলো খুবই ভেবে দেখার ব্যাপার। এগুলোর প্রতিবাদ করতে হলে প্রতিরোধ এবং প্রতিবাদের দরকার।</h3>
<h3>প্রকৌশলী শেখ মুহাম্মদ শহীদুল্লাহ<br />
আজকে আমরা বিদ্যুৎ সঙ্কট নিয়ে আলোচনা করতে এসেছি। আমাদের তো অনেক সঙ্কট। গ্যাস-কয়লা-পরিবেশ দূষণÑশিক্ষার সঙ্কটÑপরিবেশ সঙ্কট এবং দ্রব্যমূল্যের সঙ্কট। আমরা সঙ্কটের সমুদ্রে ডুবে আছি। তার মধ্যে বিদ্যুৎ অন্যতম। এই সঙ্কটগুলোর পেছনে কী? পেছনে আছে দুর্নীতি। দুর্নীতির পেছনে আছে বহুজাতিক কোম্পানি। অতএব দুর্নীতি ও বহুজাতিক কোম্পানির হস্তক্ষেপমুক্ত হতে পারলে সব সমস্যার সমাধান হয়ে যাবে। শুধু বিদ্যুৎ নয়। একযোগে সব হবে যদি আমরা সাম্রাজ্যবাদের দ্বারা চালিত না হই প্রভাবিত না হই।<br />
আগে দুর্নীতি এত ব্যাপক ও সর্বনাশা ছিল না। এখন তো চরিত্র ধ্বংস করা হচ্ছে। জাতির চরিত্র ধ্বংস করতে পারাটা কত বড় ক্ষতি। আমি গত ৫০ বছর যাবৎ দেখছি রাষ্ট্র খাতে তখন অনেক খাত ছিল, চিকিৎসা খাত ছিল, উৎপাদনের খাত ছিল। আমি দেখেছি কীভাবে ঢাকা মেডিকেল কলেজে বড় বড় অধ্যাপক সকাল ৭টা থেকে উঠে ছাত্রদের শেখানোর জন্য রাউন্ড দিয়েছেন। ডা. শামছুদ্দিন, ডা. টিএস আলম, ডা. আসিব উদ্দিন। ভোর ৭টার সময় তারা ডিউটি দিয়েছে। ছাত্রদের তারা হাতে কলমে শিখিয়েছেন। আজ সব, শিক্ষা-চিকিৎসা, সবই পণ্য হয়ে গেছে। এভাবে কমার্শিলাইজেশন করেছে গত ৪০-৫০ বছরে। সব সাম্রাজ্য বাদ করেছে। তাদের বিরুদ্ধে জনসচেতনতা করতে হবে। তাদের পরাজিত করতে হবে।<br />
রাষ্ট্র খাতকে ধ্বংস করে বেসরকারি খাতকে প্রতিষ্ঠা করে এবং আমাদের দেশের সমস্ত সঙ্কট সৃষ্টি করে যে ব্যবস্থা করা হচ্ছে তা উচ্ছেদ করতে হবে। জনগণকে নিয়ে আন্দোলন করতে হবে। সাম্রাজ্যবাদের বিরুদ্ধে আন্দোলন করতে হবে। আমাদের ধনীক শ্রেণীর দুর্নীতির বিরুদ্ধে আন্দোলন করতে হবে। তাদের গ্রাস থেকে সমাজকে মুক্ত করতে হবে।<br />
৩-৪ বছর আগে সামিট গ্রুপ একটা কাজ পেল সিরাজগঞ্জে ৪৫০ মেগাওয়াট বিদ্যুৎকেন্দ্র নির্মাণের। খালেদা জিয়া কিছুতেই ৪৫০ মেগাওয়াট বিদ্যুৎ কেন্দ্র সামিটকে দিবেন না। সেটার সঙ্গে আওয়ামী লীগের সম্পর্ক ছিল বলে। তখন টেন্ডার ঐ বিদ্যুৎ কেন্দ্রের দর কমছিল। অথচ সেটা এখন কুইক রেন্টাল করে কতটা ক্ষতি হয় দেখেন। ১ কিলোওয়াট আওয়ারের দাম ১ টাকার জায়গায় এখন ১২ টাকার মতো খরচ হচ্ছে। এর ফলে আমরা ৯ কোটি টাকা প্রতিদিন বাড়তি দিচ্ছি। ৩৬৫ দিনে আমরা ৩ হাজার কোটি টাকা বাড়তি দিচ্ছি।<br />
কুইক রেন্টালের যে পরিবেশ দূষণ হয় সেটা না-ই বললাম।<br />
প্রধানমন্ত্রী বলেছেন, কিছুতেই আমি আমার জাতীয় স্বার্থের ক্ষেত্রে যেটা জড়িত সেটা করে ছাড়বই। কে কি বলল তাতে কিছু যায় আসে না। জাতীয় স্বার্থ বলতে কি ঐ ধরনের ছোট ছোট কুইক রেন্টাল বিদ্যুতে কেন্দ্র নির্মাণ!<br />
রুহিন হোসেন প্রিন্স<br />
বিদ্যুৎ সঙ্কট উত্তরণের যে পদক্ষেপ আজ নেয়া হচ্ছিল আজকের আলোচনা থেকে এটা পরিষ্কার যে, প্রকৃতপক্ষে আজ সে অন্ধকারের দিকেই জাতিকে ফেলে দেয়া হচ্ছে। আমাদের সংবিধানের ১৬ নং অনুচ্ছেদে গ্রামীণ উন্নয়ন ও কৃষির কথা বলা আছে। সেখানে গ্রামাঞ্চলের বিদ্যুতায়নের কথা আছে। আমার জানামতে সাবেক সোভিয়েত ইউনিয়নের সংবিধানে এবং বাংলাদেশের সংবিধানে জনগণের বিদ্যুৎ পাবার অধিকারকে সাংবিধানিক স্বীকৃতি দেয়া আছে। বিশ্বের কোনো সংবিধানে এটা বলা আছে কিনা আমার জানা নেই। সংবিধানে যেখানে গুরুত্ব দেয়া ছিল সেখানে কিভাবে এটাকে শেষ করা হলো?<br />
সরকারের বাইরে আরেকটা সরকার আছে। সে আমাদেরকে পরিচালনা করে সেটাকে আমরা সাম্রাজ্যবাদ বলছি। বিশ্বব্যাংক আইএমএফ বলছি। জনগণ কি বলছে সেটি কোনো ব্যাপার নয়। তারা কী বলছে সেটিই আজ বাস্তবায়িত হচ্ছে।<br />
পথ জনগণের একটাইÑ আমাদের আন্দোলন করতে হবে।</h3>
<h3>মেজর জেনারেল (অব.) আমিন আহম্মেদ চৌধুরী বীরবিক্রম<br />
বিদ্যুৎ জাতীয় উন্নয়নের একটা সহায়ক শক্তি। সুতরাং জাতীয় পর্যায়ে উন্নয়নে সার্বিক উন্নয়নটা কী? এই উন্নয়নের যে প্রতিচ্ছবি তা আমাদের কাছে স্পষ্ট নয়। সেটা দীর্ঘমেয়াদি হতে পারে আবার স্বল্পমেয়াদিও হতে পারে আবার মধ্যমেয়াদিও হতে পারে। ৫০ এবং ৬০-এর দশকেও উন্মুক্ত বাজার ছিল এ দেশের অর্থনীতি।<br />
আমাদেরকে বার্গেনিং ক্যাপাসিটির মাধ্যমে কাজ করতে হবে। বার্গেনিং ক্যাপাসিটি যদি আমাদের না থাকে তাহলে ভারত আমাদেরকে ভৌগোলিকভাবে গ্রাস করবে না। কিন্তু অর্থনৈতিকভাবে গ্রাস করবেÑ এটা একেবারেই স্বাভাবিক। আমরা যাতে শোষিত না হই সে ক্ষমতা আমাদের নিজেদের অর্জন করতে হবে।</h3>
<h3>রাশেদ আল তিতুমীর<br />
বিদ্যুৎ খাতে যখন সংস্কার করা হয় সবার আগে করা হয়েছে ফিলিপিনের। এদের যদি কোনো বিদ্যুতের বিল দেখি তাহলে বোঝা যাবে যে আসলে কী অবস্থা। কারণ আইপিডি যেহেতু গ্যাস ব্লক দেয়া হয়, তার মানে কেনা হয়। এখন যেহেতু এটার লাভ অনেক বেশি গ্যারান্টি মার্কেট অনেক বেশি। ইনলো যখন ধ্বংস হয়ে যাচ্ছে ফিলিপিনের ইনলু ধ্বংস হচ্ছে না। কারণ ফিলিপিনের ইনলো যদি ১শ ব্যবহার করেন তার কাছ থেকে নেয়া হচ্ছে ১শ ৫০। কারণ উপরে একটা লাইন লেখা আছে। যারা সংস্কারের কাঠামো তৈরি করেছেন এইভাবে একটা আর্টিফিশিয়াল ডিমান্ডের ড্রাফ্ট দেখাবে। তারপর এত  বড় বড় পরিমাণে সাপ্লাই বাড়ে। যার দরুন সমস্যার সৃষ্টি হয়। পাবলিক রেট বেড়ে যায়। এটা ফিলিপিনের ক্ষেত্রে হয়েছে। এর ফলে দুটো রেট বেড়েছেÑ ডমেস্টিক রেট, এক্সটারনাল রেট বেড়েছে।<br />
আমাদের অর্থমন্ত্রী বর্তমানে খুব বলছেন চঁনষরপ চৎরাধঃব চধৎঃহবৎংযরঢ় নিয়ে। এটা নিয়ে তিনি যাদেরকে সবচেয়ে বেশি বিশ্বাস করেন সেটা হলে বিশ্বব্যাংক। ভারতে যেমনটা হচ্ছেÑ যতগুলো পাবলিক প্রাইভেট পার্টনারশিপ হয়েছে তার মধ্যে প্রাইভেট সেক্টর দিচ্ছে মাত্র ৭% সরকারকে দিতে হচ্ছে প্রায় ৮০%। অন্যদিকে যেখানে, যতগুলো পাবলিক প্রাইভেট পার্টনারশিপ হয়েছে তার মধ্যে মাত্র ১৬% হয়েছে বিদ্যুৎ ক্ষেত্রে। বিশ্বব্যাংক বলছে ৪টা কোম্পানি যদি সই করে তাহলে ১টা ইমপ্লিমেন্টেশন হয়েছে অর্থাৎ ২৫%। এই যদি তার অভিজ্ঞতা হয় তাহলে তিনি কি করতে চাচ্ছেন। আমার কাছে চচচ নিয়ে যে ধোঁয়াশে কথা বলা হচ্ছে এগুলোর আসলে রিভিউ হওয়া দরকার। এটা দিয়ে বিদ্যুৎ খাতের কোনো সমাধান হবে না। ফিলিপিনের অভিজ্ঞতা যা বলে রেন্টাল বিদ্যুৎ কেন্দ্রের ফলে জনগণের ওপর ট্যারিফ আরো বেড়ে যাবে। এই বিষয়গুলো দেখা দরকার।</h3>
<h3>জোনায়েদ সাকী<br />
যেখানে দেশের অর্থনীতির সীমা ছোট সেখানে বিদেশি বিনিয়োগের মুনাফা লাভের রাস্তা খুঁজে পায় না। সেবা খাতগুলো হচ্ছে মুনাফা লাভের প্রধান জায়গা। ফলে বাংলাদেশের বিদ্যুৎ-টেলিকমিউনিকেশন এই ধরনের জায়গাগুলোতে তারা সামনে যেতে পারে। টিফা যুক্তি মূলত সেই কারণেই হচ্ছে। বিদ্যুৎ সঙ্কট এবং বিদ্যুৎ ব্যবস্থা বাংলাদেশের সামগ্রিক গতিপথের সঙ্গে এটা খুব অসঙ্গতিপূর্ণ কিছু না।<br />
বিদ্যুৎ     সমস্যাটা   আসলে   একটা  রাজনৈতিক সমস্যার এই বিষয়টার ওপর আমাদের জোর দেয়া দরকার। আমি একটা উদাহরণ দিয়ে শেষ করব। ভেনেজুয়েলা হুগো শ্যাভেজ এবং বলিভিয়ার ইভা মোরালেস ৫-৭ বছর আগে তাদের ক্ষমতায় আসার পর পরই বহুজাতিক কোম্পানির সঙ্গে পুরনো চুক্তিগুলো বাতিল করে নতুন চুক্তি করে ফেলেছেন। আগে যেখানে বাংলাদেশের মতো ৮১% পেত বহুজাতিক কোম্পানি এবং ১৮-১৯% পেত রাষ্ট্রীয় কোম্পানি। এখন পুরো চিত্রটাই উল্টে গেছে। এখন ৮১% পাচ্ছে রাষ্ট্রীয় কোম্পানি। ভেনেজুয়েলা চুক্তি করেছে ন্যূনতম ৫০% থাকতে হবে রাষ্ট্রীয় কোম্পানির। শেভরন এবং ব্রিটিশ কোম্পানি এই শর্তে যদিও রাজি হয়নি কিন্তু বেশিরভাগ কোম্পানিই চুক্তি মানছে।<br />
আমাদের ধারণা হচ্ছে বহুজাতিক কোম্পানি আসবেন। আমরা যদি তাদেরকে মুলা না দেখাই। আমাদের সব গ্যাস দিয়ে দিতে হবে তাহলেই নাকি তারা আসবে। অথচ দেখুন এই জ্বালানি কোম্পানিগুলোর অবস্থা কত খারাপ। তাদের কাজের এলাকা ছোট হয়ে এসেছে। ব্রিটিশ পেট্রোলিয়ামের কত খারাপ অবস্থা দেখেন আন্তর্জাতিক আদালতে যাওয়া তো দূরের কথা আমেরিকান কংগ্রেসে গিয়ে ক্ষতিপূরণ দিয়ে, নাকে খত দিয়ে ওখানে থাকতে চাচ্ছে। তাদের বিনিয়োগের ক্ষেত্রও সীমিত হয়েছে। ফলে তাদের চোখ এখন বঙ্গোপসাগরের দিকে।<br />
রাজনৈতিক সদিচ্ছা থাকলেই এই চিত্রটা পাল্টে দেয়া যায় এই জায়গাটা আমরা উপলব্ধি করি না।</h3>
<h3>বিচারপতি গোলাম রাব্বানী<br />
আমি প্রকৌশলীও নই, অর্থনীতিবিদও নই। সারাজীবন আইন নিয়ে নাড়াচাড়া করেছি। সেই জায়গার গলদটা আমি এখানে বলতে চাই। আমরা গোড়াতেই গলদে ভুগছি। আমাদের বুদ্ধিজীবিই বলুন আর বিশ্ব পুঁজির মুৎসুদ্দিরাই বলেন সকলেই একই ভুল করছে। বাংলাদেশে যে একটা সংবিধান আছে, সংবিধান অনুযায়ী যে দেশটা চলবে, চলা উচিত অথবা চলতে বাধ্য সেটা আমরা ভুলে গেছি। শুধু সংবিধানের অনুচ্ছেদ ১৩ নম্বরটা একটু পড়লেই বিষয়টা পরিষ্কার হয়। অনেক অধ্যাপকও বোধহয় এটা পড়েন না। এই অনুচ্ছেদে লেখা আছে মালিকানা নীতি কি হবে। সেটা রাষ্ট্র পরিচালনার মূল নীতি হবে। তিনটি বিষয় বলা আছেÑ ক. রাষ্ট্রীয় খাত, খ. সমবায় খাত ও গ. আইন কর্তৃক নির্দিষ্ট ব্যক্তিগত মালিকানা।<br />
এটা যদি থাকে তাহলে তো প্রাইভেট সেক্টর থাকার কথা নয়। বিদেশি পুঁজি আনার কথা নয়। কিন্তু আমরা সংবিধানের কথাটা ভুলে গেছি। ভুলে যাওয়ার কারণে সমাজতান্ত্রিক দেশ গড়ার যে একটা স্বপ্ন ছিল আমাদের সেটা হয়নি। মুক্তিযুদ্ধটা হয়েছিল সমাজতান্ত্রিক অর্থনীতি প্রতিষ্ঠা করার জন্য এটা আমরা ভুলে গেছি। এবং সবচেয়ে আশ্চর্য কথা অসংবিধানিক কথাটা পাওয়া যাচ্ছে বাজেট মিটিংয়ের বক্তব্যে। যেটা আলোচনার প্রস্তাবনায় উদ্ধৃত হয়েছেÑ ‘ভবিষ্যতে বেসরকারি খাতে বিদ্যুৎ সরবরাহ অনেক বেড়ে যাবে এবং গ্যাস ছাড়া অনেক জ্বালানি সূত্রের ব্যবহার প্রসার লাভ করবে।’<br />
অথচ বাংলাদেশের সংবিধান বেসরকারি খাত জানে না। কিন্তু সবচেয়ে অসুবিধা হলো যে এই কথাগুলো রাষ্ট্রীয় পরিচালনার মূলনীতিতে আছে।<br />
সংবিধানের প্রথম ভাগ প্রস্তাবনা। দ্বিতীয় ভাগে এসব কথা বলা আছে। কিন্তু এর সঙ্গে ছোট্ট একটি কথা লেখা আছে যে, রাষ্ট্র পরিচালনার মূলনীতিগুলো কার্যকর রাখার জন্য হাইকোর্টে রিট করা যাবে না। তবে যারা জনস্বার্থে অনেক রিট করছেন তাদেরকে বিনা ফি-তে একটা আইনি পরামর্শ দিইÑ এটা ইতিবাচক যে আপনি রাষ্ট্রকে বলতে  পারবেন না যে রাষ্ট্রের মূলনীতি পরিচালনাটা এভাবে করতে হবে। কিন্তু রাষ্ট্র যদি বিপরীত করে সেটাকে নিয়ে তো রিট করা যায়। এটা নিয়ে কেউ চিন্তা করেননি। যদি দেখা যায় রাষ্ট্র পরিচালক মূলনীতির বিরুদ্ধে কিছু করা হচ্ছে তখন আইনি পদক্ষেপ নিয়ে তার বিরুদ্ধে দাঁড়ানো যায়।<br />
আমার মনে হয় আমাদের বিচার বিভাগ আগের চেয়ে অনেক সাহসী হয়েছেন। অনেক নতুন এবং তরুণ বিচারপতি আমরা পেয়েছি। আপনারা এদিক থেকে লক্ষ্য করবেন রাষ্ট্র পরিচালনার মূলনীতিটাকে না মেনে যদি বিপরীত কিছু করা হয় তাহলে হাইকোর্টে রিটে রিটে সয়লাব করে দিন। দেখবেন সরকার সংযত হবে।</h3>
<h3>আলোচকবৃন্দ<br />
(আলোচকবৃন্দ : আলোচনার ক্রমানুসারে)<br />
আনু মুহাম্মদ<br />
অর্থনীতিবিদ<br />
প্রকৌশলী বি ডি রহমত উল্লাহ<br />
সাবেক মহাপরিচালক, পাওয়ার সেল<br />
আমানুল ইসলাম চৌধুরী<br />
সাবেক উপদেষ্টা জ্বালানি মন্ত্রণালয়, তত্ত্বাবধায়ক সরকার<br />
অধ্যাপক আবু আহমেদ<br />
অর্থনীতিবিদ<br />
কাজী ফারুক<br />
সভাপতি, কনজ্যুমার এসোসিয়েশন অব বাংলাদেশ (ক্যাব)<br />
প্রকৌশলী শেখ মুহাম্মদ শহীদুল্লাহ<br />
আহবায়ক, তেল গ্যাস বিদ্যুৎ বন্দর রক্ষা জাতীয় কমিটি<br />
রুহিন হোসেন প্রিন্স<br />
রাজনীতিবিদ<br />
মেজর জে. (অব.) আমিন আহম্মেদ চৌধুরী বীর বিক্রম<br />
সাবেক রাষ্ট্রদূত<br />
রাশেদ আল তিতুমীর<br />
অর্থনীতিবিদ ও উন্নয়ন বিশেষজ্ঞ<br />
জোনায়েদ সাকী<br />
রাজনীতিবিদ<br />
বিচারপতি গোলাম রাব্বানী<br />
আইনজ্ঞ<br />
আলোচনার প্রস্তাবনা<br />
শুভ কিবরিয়া<br />
সঞ্চালক<br />
গোলাম মোর্তোজা<br />
সম্পাদক, সাপ্তাহিক</h3>
<h3>সহযোগিতা  : বাহরাম খান ও আরিফুর রহমান<br />
শ্রুতিলিখন  : নিজামউদ্দিন<br />
আশেকুন্নবী টুটুন<br />
ছবি  :  মাহ্মুদা তুলি</h3>
<p><a href="http://www.shaptahik.com/v2/?DetailsId=3946"></p>
<p>http://www.shaptahik.com/v2/?DetailsId=3946</a></p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F24%2F%25e0%25a6%25ac%25e0%25a6%25bf%25e0%25a6%25a6%25e0%25a7%258d%25e0%25a6%25af%25e0%25a7%2581%25e0%25a7%258e-%25e0%25a6%25b8%25e0%25a6%2599%25e0%25a7%258d%25e0%25a6%2595%25e0%25a6%259f-%25e0%25a6%2593-%25e0%25a6%259c%25e0%25a6%25a8%25e0%25a6%25b8%25e0%25a7%258d%25e0%25a6%25ac%25e0%25a6%25be%25e0%25a6%25b0%25e0%25a7%258d%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>For immediately adopting an appropriate coal mining strategy</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F14%2Ffor-immediately-adopting-an-appropriate-coal-mining-strategy%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F14%2Ffor-immediately-adopting-an-appropriate-coal-mining-strategy%2F#comments</comments>
		<pubDate>Wed, 14 Jul 2010 11:32:05 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[COAL]]></category>
		<category><![CDATA[english]]></category>
		<category><![CDATA[bangladesh]]></category>
		<category><![CDATA[bangladesh coal news]]></category>
		<category><![CDATA[bangladesh energy sector]]></category>
		<category><![CDATA[Coal mining]]></category>
		<category><![CDATA[Coal policy]]></category>
		<category><![CDATA[energy sector]]></category>
		<category><![CDATA[Environmental]]></category>
		<category><![CDATA[Gas Field]]></category>
		<category><![CDATA[Mine]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2848</guid>
		<description><![CDATA[
OPINION
For immediately adopting an appropriate coal mining strategy
Saleque Sufi
There is no dearth of proposals for short-, medium- and long-term actions to help overcome the problems that the country is now facing in its vital energy sector. Seminars, symposia and round-table meetings have been held aplenty, both at home and abroad, in the last couple of [...]]]></description>
			<content:encoded><![CDATA[<div>
<div id="lead_title">OPINION<br />
<a href="http://www.thefinancialexpress-bd.com/more.php?news_id=105270&amp;date=2010-07-07" target="_blank"></a><a href="For immediately adopting an appropriate coal mining strategy">For immediately adopting an appropriate coal mining strategy</a><br />
<strong>Saleque Sufi</strong></p>
<p>There is no dearth of proposals for short-, medium- and long-term actions to help overcome the problems that the country is now facing in its vital energy sector. Seminars, symposia and round-table meetings have been held aplenty, both at home and abroad, in the last couple of years for synergising actions to confront the prevailing and emerging energy crisis. Issues that are relevant to energy crisis and gas crunch are now, by and large, known. So also some possible remedies have been identified, time and again. But actions are yet hard to come to grapple with the situation.</p>
<p>In this context, it would be relevant to recall here that some non-resident Bangladeshis (NRBs) from the USA, Australia and the Philippines participated in a government-sponsored brain-storming on coal mining strategy, held last year around this time inDhaka . Intensive interactions took place then, over a period of four days in Jamuna Bridge resort, with government policy-makers and resident Bangladeshi professionals on coal mining strategy. Professional coal miners with hands on mining experience suggested what would need to be done at the under-performing mine at Barapukuria. Mine city planners and GIS experts presented relevant aspects of resettlement and rehabilitation issues. Environmental and other aspects associated with mining were also discussed there. A complete set of recommendations on coal policy emerged out of the round-table conference.<br />
<div id="attachment_524" class="wp-caption alignright" style="width: 156px"><img src="http://www.bdelink.com/wp-content/uploads/2010/02/coal.jpg" alt="কয়লা বিদ্যুৎ কেন্দ্র" title="coal power plant" width="146" height="95" class="size-full wp-image-524" /><p class="wp-caption-text">coal power plant</p></div><br />
One year has whistled away. But coal policy continues to remain in hibernation. Leaving huge domestic coal resource underground, the vested quarters are conspiring to set up coal-fired power plants based on imported coal.</p>
<p>Over the last one year, no new gas field was discovered; there were no worthwhile exploration efforts to discover any gas resource. No gas field, worth mentioning, was further developed. Action did not also come to seal leakage of Titas gas field. No new gas transmission infrastructure of gas was set up. Demand has grown in the meantime. Production crisis and transmission constraints of gas system have created crisis over power generation, fertilizer production and operation of industries. Can any democratic government sustain this situation so long? What are the answers of energy sector policy-makers?</p>
<p>Last winter Dhaka city and adjoining areas experienced the worst gas crisis of history. None told us that situation improved much. Desperate management actions were talked about then, for gas rationing, holiday staggering, shutting down CNG fuelling station operations until 4PM on every week days. But such measures, even if operationalised at full gear, would not bring much relief, as the experts fear.</p>
<p>According to reliable sources, the country&#8217;s gas deficit is about 300 MMCFD now. National production capacity is 2000 MMCFD but for transmission constraint, only about 1950 MMCFD can be transported. Even that transportation is affected by low pressure over entire gas grid, as the main transmission segment N-S Corridor from Beanibazar to Ashuganj transmission system is supersaturated. No on-stream pigging to clean these pipelines has been conducted since the commissioning of these pipelines. There are no pipeline compressor stations in the system. The government has already run into controversy regarding Muchai Compressor installations. So there is no immediate respite from gas system crisis.</p>
<p>The country&#8217;s peak power demand already is about 6000MW. Power Development Board (PDB) can generate about 3800-4000MW. There was little or no addition from last year. PDB claims that about 600MW capacity is lying idle for gas supply crisis. It has been learnt that Petro Bangla (PB) is taking actions to increase gas production from operated gas fields at Bhangura, Meghna and Titas. But there is no guarantee that these will be available soon.</p>
<p>The people of Bangladesh have every right to question the non-performance of the authorities concerned or their non-achievement in power sector and gas sector over the past several months. Development of energy sector issues is left uncared for all practical purposes. But some policy-makers have remained themselves busy with useless road shows at abroad. They are repeating the same at home, now. What benefits would these ventures bring to Bangladesh energy sector? Why have not PDB and Petrobangla Chairmen been able to resolve gas supply topower generation units while they are too busy with non-substantive matters? The energy sector policy-makers and managers owe explanations to the nation.</p>
<p>We cannot come out of the crisis so long we cannot  realistically diversify fuel for power generation. We must immediately adopt appropriate coal mining strategy. Domestic coal is our best option for power generation. We must start mining of coal in our mines by economic means to extract maximum resource in proven technique and start setting up some large capacity mine power plants. Plants on imported coal will not be economic and cannot be set up in less than five years. These are all hypes and ways of trapping Bangladesh permanently on external dependence.</p>
<p>Gas sector is also suffering from competency crisis. Key management has little capability. There is no way for the gas system to come out of present crisis in less than three years. But some contingency measures can create some comfort. We do not understand why gas saved for routine maintenance of KAFCO and forced outage of CUFL cannot bring Raujan and Shikhalbaha to full capacity generation, at least temporarily. Fertilizer plants unfortunately are the only ones which can be shut down on rotations to divert gas for other use including power plants. PDB must also try to produce maximum from energy efficient plants. People do not want to listen to blaming games between PDB and Petrobangla.</p>
<p>&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;&#8230;.</p>
<p>The writer is the ex-Director (Operation), GTCL, and</p>
<p>writes from Australia</p></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F14%2Ffor-immediately-adopting-an-appropriate-coal-mining-strategy%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Relevant issues of  Bangladesh power sector development</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Frelevant-issues-of-bangladesh-power-sector-development%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Frelevant-issues-of-bangladesh-power-sector-development%2F#comments</comments>
		<pubDate>Tue, 13 Jul 2010 10:41:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[english]]></category>
		<category><![CDATA[Bangladesh power]]></category>
		<category><![CDATA[Bangladesh power sector]]></category>
		<category><![CDATA[electricity]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2843</guid>
		<description><![CDATA[
Relevant  issues of power sector development


// < ![CDATA[//  
// < ![CDATA[// 
A S M Alamgir Kabir
Electricity is an essential ingredient  for socio-economic progress and qualitative improvement of people&#8217;s  lifestyle. The power sector is working tirelessly for ensuring reliable  power supply commensurate with a rapidly rising demand.
Advancement  in the power [...]]]></description>
			<content:encoded><![CDATA[<div>
<h1 id="lead_title"><strong><a href="http://www.thefinancialexpress-bd.com/more.php?news_id=97576&amp;date=2010-04-13" target="_blank">Relevant  issues of power sector development</a></strong></p>
<p><a rel="attachment wp-att-2844" href="http://www.bdelink.com/index.php/2010/07/13/relevant-issues-of-bangladesh-power-sector-development/a-s-m-alamgir-kabir/"><img class="alignleft size-thumbnail wp-image-2844" title="A S M Alamgir kabir" src="http://www.bdelink.com/wp-content/uploads/2010/07/A-S-M-Alamgir-kabir-150x145.jpg" alt=" এ এস এম আলমগীর কবির ,পিডিবি চেয়ারম্যান" width="150" height="145" /></a></h1>
<div>
<div><script type="text/javascript">// < ![CDATA[// <![CDATA[
google_ad_client = "pub-6997572207875846";
/* 300x250, created 8/6/08 */
google_ad_slot = "6059542371";
google_ad_width = 300;
google_ad_height = 250;
// ]]&gt;</script> <script src="http://pagead2.googlesyndication.com/pagead/show_ads.js" type="text/javascript">
</script><script type="text/javascript">// < ![CDATA[// <![CDATA[
google_protectAndRun("ads_core.google_render_ad", google_handleError, google_render_ad);
// ]]&gt;</script><ins></ins><ins></ins></div>
<p><strong>A S M Alamgir Kabir</strong></p>
<p>Electricity is an essential ingredient  for socio-economic progress and qualitative improvement of people&#8217;s  lifestyle. The power sector is working tirelessly for ensuring reliable  power supply commensurate with a rapidly rising demand.</p>
<p>Advancement  in the power sector in one year</p>
<p>The installed capacity of  electricity in January 2009 was 5450 megawatt. But actual production was  3500 megawatt.</p>
<p>During the first year of the present government,  531 megawatt of electricity has been added by launching new power plants  (including commissioning and test runs). As a result, installed  capacity has risen to 6000 megawatt. Because of the worsening of gas  crisis, actual production stood at 3750 megawatt in January, 2010.  Production of 4500 megawatt electricity would have been possible if  there was no gas crisis.</p>
<p>Present status of power generation and  distribution</p>
<p>The power generation capacity derated is at present  5425 megawatt. Of this, production capacity in the public sector is 3438  megawatt, while it is 1987 megawatt in private sector. Current demand  for electricity is 4500 megawatt, which will rise to 5800 megawatt next  summer. At present, reliable capacity of production ranges between 3800  megawatt and 4500 megawatt. The record of maximum production till now  has been 4296 megawatt (on 28 September 2009). Demand for electricity is  rising at a rate of 8% on an average.</p>
<p>Future plans for  increasing power generation</p>
<p>In the backdrop of present gas  shortage, installations of power plants run by imported coals and  liquefied natural gas in future are being considered now. The government  has taken up a plan for &#8216;limited gas, coal, oil and liquefied gas&#8217;  based power generation instead of the previous &#8216;adequate gas&#8217; based  ones.</p>
<p>The government has undertaken massive programmes for  filling the gap between demand and supply of power in the backdrop of a  failure in the past to set up new power plants for keeping pace with the  rising demand for electricity.</p>
<p>Swift initiative: For very swift  implementation considering the availability of primary fuel,  establishment of oil (diesel and furnace oil) based 530 megawatt  capacity rental power plants are now under process. Agreements for  generating 265 megawatt power have already been signed under this  initiative.</p>
<p>Short-term initiative: Steps have been taken for  setting up 820 megawatt capacity oil  (furnace oil) based power plants in the public sector for execution  within June, 2011. Of these, the cabinet committee on purchase has  already approved establishment of five power plants having a total  capacity of 350 megawatt. Besides, plans have been approved for  constructing two 100 megawatt capacity peaking plants in the private  sector at Kaliakoir and Savar.</p>
<p>Mid-term initiative:	Work has  started on setting up 300-450 megawatt plants Bibiana, 150-225 megawatt  plants at Bhola and 300-450 megawatt combined cycle power plants a  Meghnaghat in the private sector, which will be implemented within the  next three to five years. A notable initiative under this plan-category  is setting up of 2,600 megawatt capacity efficient power plant based on  imported coal within the year 2014-15.</p>
<p>If these initiatives are  implemented on time, then the country will be able to free itself form  the horror of power-crisis by the year 2013. For implementing these  projects US $7.0 billion will be required where the power sector will  require US$ 10 billion in next five years. Three road shows were  organised recently in London, Singapore and New York for attracting  investments. A huge response was observed among investors during these  events.</p>
<p>Long-term initiative: Atomic energy generated and coal  based big Power Plan will be established in the long-run.</p>
<p>Renewable  energy-based power generation</p>
<p>Work has already started for  setting up 100 to 200 megawatt capacity wind-driven power plant and 9 to  14 megawatt solar power plants under the Renewable Energy Policy-2008.</p>
<p>Inter-state  exchange of power</p>
<p>Plans have been taken up under the preview of  international trade to import power from the north-eastern region of  India, Bhutan and Nepal in future, including 250-500 megawatt  electricity from India&#8217;s West Bengal. It will be possible to launch this  import/export programme within 2012 after installing 125 kilometre long  400 KV transmission line.</p>
<p>Energy-saving measures</p>
<p>Staggered  holiday are being continued in industrial establishments. Programme for  keeping shopping malls and markets closed after 8 pm at night has been  implemented. Steps have been taken, for installing energy-saving bulbs  in all government and autonomous bodies. Around 10 million efficient CFL  bulbs are being given to electricity subscribers free of charge. All  government, semi-government and autonomous bodies have been instructed  to keep the temperature of their air-conditioners at 24 degree Celsius  or above and users are being encouraged to switch off their ACs during  peak hours. Directives have been issued to officers and employees for  not wearing suits in public and private offices during March-November  period. Daylight Saving Time (DST) system has been introduced for the  first time in Bangladesh between 19 June and 31 December 2009, by  advancing the clock by one hour.</p>
<p>As a result of these initiatives  demand for power has decreased by 900 megawatt.</p>
<p>Irrigation management</p>
<p>Management  measures have been taken to ensure uninterrupted  power supply for irrigation  pumps from 11 pm at night to 7 am in the morning during the  irrigation season. Steps have been taken for sustained supply of power  for irrigation pumps through load-shedding (if needed) in urban areas  during off-peak hours (from 11 pm at night to 5 pm the after noon).</p>
<p>System  loss: System loss in the power sector is currently (2009 final year)  14.6%, which was over 30% even a decade ago.</p>
<p>Tariff</p>
<p>The  Power Development Board has to incur a loss of 0.29 taka per unit in  case of bulk sales, as the production cost is higher compared to sales  price. The sales price of electricity need to be enhanced in order to  sustain the programme for increasing power generation. A step by step  increase in price is justified in order to make it tolerable for the  subscribers.</p>
<p>At present, 47 per cent of the country&#8217;s population  has come under the purview of electricity coverage. Around 75 million  people remain outside this coverage, and the remaining 70 million do not  get reliable electricity supply. Percapita power generation in the  country is currently 184 kilowatt hour, which is very low compared to  other countries of the world. In this backdrop and in accordance with  its Vision-2021, the government has undertaken massive programmes for  increasing power generation in order to bring dependable power supply to  the doorsteps of the whole population by keeping it within their  purchasing power.</p>
<p>The writer is Chairman, Bangladesh Power  Development</p></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Frelevant-issues-of-bangladesh-power-sector-development%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Coal mining  in open pits &#8212; experience in Germany challenge in Bangladesh</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fcoal-mining-in-open-pits-experience-in-germany-challenge-in-bangladesh%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fcoal-mining-in-open-pits-experience-in-germany-challenge-in-bangladesh%2F#comments</comments>
		<pubDate>Tue, 13 Jul 2010 10:26:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[COAL]]></category>
		<category><![CDATA[english]]></category>
		<category><![CDATA[bangladesh]]></category>
		<category><![CDATA[Barapukuria]]></category>
		<category><![CDATA[Coal mining]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[MW]]></category>
		<category><![CDATA[open pits]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2841</guid>
		<description><![CDATA[
Coal mining  in open pits &#8212; experience in Germany challenge in Bangladesh
Dr. Thomas von Schwarzenberg
OPEN pit coal mining in Germany  has a tradition of more than a hundred years. Thousands of employees  have benefited from their jobs in this sector and about 25% of German  electricity is presently generated by coal [...]]]></description>
			<content:encoded><![CDATA[<div>
<div id="lead_title"><a href="http://www.thefinancialexpress-bd.com/more.php?news_id=97582&amp;date=2010-04-13" target="_blank"><strong>Coal mining  in open pits &#8212; experience in Germany challenge in Bangladesh</strong></a></p>
<p><strong>Dr. Thomas von Schwarzenberg</strong><a href="http://www.bdelink.com/index.php/2010/04/25/petroleum-products-demand-raised-by-five-times/fe-logo-16/" rel="attachment wp-att-2394"><img src="http://www.bdelink.com/wp-content/uploads/2010/04/fe-logo4.bmp" alt="কয়লা " title="fe logo" class="alignright size-full wp-image-2394" /></a></p>
<p>OPEN pit coal mining in Germany  has a tradition of more than a hundred years. Thousands of employees  have benefited from their jobs in this sector and about 25% of German  electricity is presently generated by coal mined in German open pit  mines.</p>
<p>RWE is one of the largest European electricity producers  with a total installed power plant capacity of 44,000 MW out of which  nearly 11,000 MW are derived from coal mined in open pits, while the  remaining power is derived from underground mined coal, gas, nuclear and  renewables. Other activities of RWE are the technical, environmental  and economical assessment of open pit coal mines around the world.  Recent projects were the re-infiltration of ground water in the Indian  coal open pit Neyveli, the planning of deepening the open pit coal mine  Mae Moh in Thailand to 600 meter depth, a feasibility study on the  Barapukuria Mine development or the present assistance in the coal open  pit industry development in the Thar Desert of Pakistan.</p>
<p>Open pit  mining is often associated with significant impacts on the environment  and on citizens living within and around the open pit mining areas. The  long tradition in German mining operations has accustomed people to  these inconveniences as most of them identify themselves with the  operations and are proud to live in an economically important part of  Germany where generations of families find jobs in the operations.</p>
<p>Meanwhile  the RWE mines in operation altogether have reached a surface area of  nearly 100 square kilometres while depth of more than 400 meters is  achieved. Nearly 100 Mio tons of coal is mined per year. This leads to  significant impacts especially to the groundwater balance, the land of  the farmers and the homes of those who live in the mining areas. To this  end the following technical and social measures have been in practice  for many years and have been well acknowledged and commonly elaborated  by government authorities, persons concerned and RWE as operator. Some  examples shall illustrate that.</p>
<p>Out of the present 600 Mio cubic  meters of abstracted groundwater 50 Mio are locally re-infiltrated into  the ground to stabilise the groundwater table close to surface to  protect large vulnerable wet land  areas with numerous red list fauna and flora. Other groundwater is  distributed to villages and cities for drinking purpose. Farmers or  industries which lost their own water supply due to lowering of the  groundwater table are compensated either by payments or by drilling  deeper wells by RWE. Refilled land is reclaimed by own RWE farmers by  enriching the soil with humus and nutrients during a four years  operation. Then the land is returned to the farmers. These measures are  monitored by the Chamber of Agriculture. 260 km2 are already reclaimed.  During the last decades 34,000 people have been resettled. This  resettlement is a joint act between the government, the resettlers and  RWE. The resettlers have the right to choose the location where to be  relocated as a community or go wherever they want. They have a voice to  decide on the layout of the new village  and their new house.</p>
<p>Bangladesh future open pit mines</p>
<p>Barapukuria  and Phulbari mine areas show partly similar features with quite thick  groundwater horizons the water table of which has to be lowered at  pumping rates of around 200 Mio cubic meters per year and partly also  re-infiltrated to reduce environmental  impacts. Part of this water will be available for the villagers  as potable water, similar to the German practice. For both Barapukuria  and Phulbari dewatering and re-infiltration scenarios were elaborated by  RWE. Resettlement will be also a major issue in the Bangladesh coal  fields and the general procedures will be similar to those practiced at  the RWE mines for more than fifty years. The Bangladesh open pits will  also have large depths of more than 300 meters similar to the RWE  operations. Also The Barapukuria/Phulbari mines are planned to be partly  refilled and reclaimed for agricultural use. Overburden disposal will  start at outside dumps and then gradually be progressed inside the mine  likewise the procedure at the RWE mines. All mining, groundwater,  environmental and resettlement procedures of the future Bangladesh open  pit mining is since long term in practice at the RWE operations where it  is elaborated technically detailed and sophisticated and approved by  rigorous German mining authorities.</p>
<p>Legal issues</p>
<p>One of  the main legal aspects of mining is the mine permit and associated  permits such as water permit, environmental permit, waste permits and  many others.</p>
<p>The German procedures regarding all these permits  are regulated under the German Mining Act. The most important part of  this Mining Act is it&#8217;s §1 which states &#8220;The intention of this act is to  secure raw material supply by regulating and supporting mining  activities&#8221; This means an obligation of the government to act  responsibly and to promote mining activities. Therefore the German  Government is obliged to grant a mining permit when the operator has  satisfactorily prepared all technical, environmental, social, and safety  regulations required to operate the mine. In this context it is very  important that all permits are accurately proved and follow the  requirements in the respective acts.</p>
<p>We experience in Germany  every year that courts are frequently appealed to withhold the approval  for any mining or power plant developments or other large infrastructure  projects due to assumed or actual procedural errors. Therefore the very  accurate adherence to permit legislation is both in the interest of the  government and the operator.</p>
<p>Possible coal production at  Barapukuria/ Phulbari</p>
<p>The Barapukuria/Phulbari open pit will be a  rather deep hole with a depth of more than 300 meters and will have a  quite high costly continuous groundwater pumping rate. In addition,  appreciable cost is involved due to re-settling, infrastructure and land  reclamation. All these issues will require the mine to be operated with  an output of at least 10 Mio tons of coal per year in order to be  profitable and also to provide a reasonable amount of working places in  the mine the power plant and for subcontractors.</p>
<p>Another  criterion for the coal production s the lifetime of the mine. The  mineable resources of the Barapukuria/Phulbari deposit are around 800  Mio tons of coal. A lifetime of 50 years should at least be considered  as otherwise the new work places would be gone too quickly and nobody  would understand why to resettle only for a short boom time. A life time  of 50 years would allow a coal production of 16 Mio t per year.</p>
<p>Underground  mining would reduce the mineable resources by up to 280 Mio t to about  520 Mio t. This would lead to a national loss in energy value of up to  15 billion US$. This figure shows that beside the mining risk  underground mining is out of question.</p>
<p>Another question which was  intensively discussed is the possible export of coal. It is understood  that the vast majority of the Bangladesh coal must be used in the  country to overcome the critical energy situation over a long period  into the future. As the future open pit will, however, mine also about  25 % of PCI coal (pulverised coal injection) which is used in blast  furnaces, it is worth thinking about having limited coal exports of this  high-price coal to improve the negative Bangladesh trade balance and  realise somewhat higher taxes or royalties and not to base the coal  production only on power generation.</p>
<p>One of the different  possible scenarios on the conservative side could therefore be:</p>
<p>3000  MW power plant; 10 Mio t/a coal for the power plant; 1.5 Mio t/a PCI  coal for export; 11.5 Mio t/a total coal exploitation; 70 years lifetime  of the mine.</p>
<p>Roadmap to coal mining in Bangladesh</p>
<p>During  the past years the Bangladesh government has tried to resume coal  activities. Up to today these attempts have not been successful. One of  the reasons is the lack of spiritedness to act. This is understandable  as the country has so far not any experience in such large scale mining  projects associated with considerable environmental and social impact.  It is also especially the still imponderable reaction of the thousands  of villagers at the future mine site who will face far-reaching changes  in their daily life.</p>
<p>The Bangladesh government will in any case  need support in decision making from independent experienced  organisations not only to achieve secured state of knowledge. Moreover  it will be necessary to have a neutral independent and from all parties  concerned accepted agency to competent assist in tackling and monitoring  the upcoming environmental impacts, resettlements and their social  effects.</p>
<p>The following immediate measures are necessary:</p>
<p>Presently  the only coal areas investigated in more detail are those of  Barapukuria and Phulbari. As these deposits have to be regarded as  nearly one unit, it is necessary to set up a master plan for their  future development. In order not to delay start up of the first mining,  the Phulbari deposit as the best investigated should, however, be  brought into mining at such design that a continuation of mining into  the Barapukuria field is possible without the need to establish new  outside dumps and a second residual lake. This would avoid unnecessary  land demand.</p>
<p>It must be made sure that all legal aspects for the  mining permits are accurately observed to avoid any success of court  appeals to enjoin these permits. Be assured that those attempts will  happen in the future.</p>
<p>To guarantee long-term competent government  control of the operations in view of safety, environmental aspects, and  relocation the establishment of an effective and powerful mining  authority is inevitable. The present poor control of the risky  underground workings at Barapukuria shows that institutional  strengthening of this authority is indispensable. Effective government  control will also contribute to a better acceptance of the project by  the villagers.</p>
<p>The start of coal mining at Phulbari was abruptly  interrupted by the events of August 2006. Any future activity must first  be reconciled with the citizens of that area. In this respect it is not  the technical or legal issues which one has to focus on primarily but  the social aspects. These are: Participation, and information of the  local people. Creating identification among the people with the project  that makes them feel that the future centre of Bangladesh is not Dhaka  but their area, their coal, their workforce which is the motor of the  future Bangladesh development. Establishment of broad possibilities for  the local population to work in the mines and in the future power plants  by setting up training schools run by government and operator.  Safeguarding that part of the taxes and royalties remain within the  local villages to develop infrastructure, education and health system.  Only through these measures will it be possible to create a new mutual  trust both in the government and the future mine operator.</p>
<p>The  main success of the project is inevitably linked to the mobilisation of  the villagers. This is also a German experience. They do not rely on  technical issues. They must get the feeling that they have a real vision  for their future, welfare and prosperity.</p>
<p>The French writer  Antoine de Saint-Exupéry has expressed this thus: &#8220;If you want to build a  ship, don&#8217;t drum up the men to gather wood, divide the work and give  orders. Instead, teach them to yearn for the vast and endless sea.&#8221;</p>
<p>The  author is associated with  RWE AG</p></div>
</div>
<p><a href="http://www.thefinancialexpress-bd.com/more.php?news_id=97582&#038;date=2010-04-13"></a></p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fcoal-mining-in-open-pits-experience-in-germany-challenge-in-bangladesh%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Petrobangla and the indigenous natural gas and coal resources of Bangladesh</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fpetrobangla-and-the-indigenous-natural-gas-and-coal-resources-of-bangladesh%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fpetrobangla-and-the-indigenous-natural-gas-and-coal-resources-of-bangladesh%2F#comments</comments>
		<pubDate>Tue, 13 Jul 2010 10:18:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[COAL]]></category>
		<category><![CDATA[Gas]]></category>
		<category><![CDATA[english]]></category>
		<category><![CDATA[bangladesh]]></category>
		<category><![CDATA[CNG]]></category>
		<category><![CDATA[gas]]></category>
		<category><![CDATA[Gas Field]]></category>
		<category><![CDATA[LPG]]></category>
		<category><![CDATA[Petrobangla]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2838</guid>
		<description><![CDATA[
Petrobangla  and the indigenous natural gas and coal resources of Bangladesh

Prof. Dr. Md. Hossain Monsur
The current statutory basis for  Petrobangla is the Bangladesh Oil, Gas and Mineral Corporation  Ordinance, 1985 which reorganised Petrobangla as a statutory corporation  to carry out the purposes of the Ordinance.	Section-9 of the Ordinance  specifies the [...]]]></description>
			<content:encoded><![CDATA[<div>
<div id="lead_title"><a href="http://www.thefinancialexpress-bd.com/more.php?news_id=97578&amp;date=2010-04-13" target="_blank">Petrobangla  and the indigenous natural gas and coal resources of Bangladesh</a></p>
<p><a rel="attachment wp-att-2840" href="http://www.bdelink.com/index.php/2010/07/13/petrobangla-and-the-indigenous-natural-gas-and-coal-resources-of-bangladesh/hossain-monsur-2/"><img class="alignleft size-full wp-image-2840" title="Hossain Monsur" src="http://www.bdelink.com/wp-content/uploads/2010/07/Hossain-Monsur.jpg" alt=" অধ্যাপক. ড. হোসেন মনসুর" width="140" height="144" /></a><br />
<strong>Prof. Dr. Md. Hossain Monsur</strong><a rel="attachment wp-att-2394" href="http://www.bdelink.com/index.php/2010/04/25/petroleum-products-demand-raised-by-five-times/fe-logo-16/"><img class="alignright size-full wp-image-2394" title="fe logo" src="http://www.bdelink.com/wp-content/uploads/2010/04/fe-logo4.bmp" alt="gas " /></a></p>
<p>The current statutory basis for  Petrobangla is the Bangladesh Oil, Gas and Mineral Corporation  Ordinance, 1985 which reorganised Petrobangla as a statutory corporation  to carry out the purposes of the Ordinance.	Section-9 of the Ordinance  specifies the functions of the Petrobangla.	It&#8217;s Sections 10 and 10A of  the ordinance permits Petrobangla to form subsidiary companies for  exploration and exploitation of oil, gas and mineral resources and to  hold shares to any company formed for this purpose.</p>
<p>Pursuant	to  these provisions Petrobangla now has one exploration and production  company named Bangladesh Petroleum Exploration	and Production Company  (BAPEX), two production companies namely Bangladesh Gas Fields Company  Limited (BGFCL) and Sylhet Gas Field Limited (SGFL) and four gas  distribution companies named as Titas Gas  Transmission &amp;  Distribution Company (TGTDCL), Bakhrabad	Gas  Systems Limited (BGSQ, Jalalabad Gas Transmission &amp;  Distribution Systems Limited (JGTDSL) and Paschimanchal Gas Company  Limited (PGCL).</p>
<p>Two other companies are the Gas Transmission  Company Limited (GTCQ functioning as the national grid gas carrier to  the distribution companies and Rupantarita Prakritik Gas Company Limited  (RPGCL) which	is a NGL processing and CNG	marketing company. It is to  be mentioned here that two more gas distribution are in the formation  stage which are named as Karnaphuli Gas Distribution Company	Limited  (KGDCL) and Sundarban Gas	Distribution Company Limited (SGCL).</p>
<p>At  present, Petrobangla, the Bangladesh Oil, Gas and Mineral Corporation  is empowered and entrusted by an Ordinance of the Government of the  Peoples&#8217; Republic of Bangladesh (GOB) to perform the following:</p>
<p>l  Exploration and development of the oil, gas and mineral resources as  per the policies of the GOB.</p>
<p>l Coordinate, plan and supervise the  activities of 11 subordinate companies.</p>
<p>l Overall control and  coordination of the production, transmission and &#8216;Marketing of gas,  condensate, CNG, oil and mineral resources produced in the country.</p>
<p>l  Conduct necessary research required in oil, gas and mineral  exploration.</p>
<p>l Enter into Production Sharing Contracts (PSC) with  International Oil Companies for exploration and development of oil and  gas and to supervise, monitor and coordinate the activities under the  signed PSCs.</p>
<p>lImplement important projects to develop the gas and  mineral sector with the annual government fund and assistance&#8217;s  provided by the friendly countries and international development  partners/organisations.</p>
<p>l Any other functions and  responsibilities as directed by the government from time to time.</p>
<p>l  The Board of Directors of Petrobangla is the policy making and managing  body of the Corporation, with five full-time Directors and Directors  from various Ministries. The Corporation is under the administrative  control of the Energy and Mineral Resources Division (EMRD) of the  Ministry of Power, Energy and Mineral Resources. It has also close  relationship, through EMRD, with Ministry of Finance and Ministry of  Planning for its development programs. There is also active relationship  with numerous functional bodies such as, National Board of Revenue,  Department of Explosives, and Department of Environment for specific  work functions. The activities of the Corporation is reviewed and  examined by the Public Accounts Committee and the Parliamentary Standing  Committee.</p>
<p>Functions of Petrobangla</p>
<p>companies at a glance</p>
<p>l  Bangladesh Petroleum Exploration &amp; Production Company Ltd. mandated  for oil and gas exploration and production.</p>
<p>l Bangladesh Gas  Fields Company Ltd. mandated for oil and gas production.</p>
<p>l Sylhet  Gas Fields Ltd. mandated for oil and gas production</p>
<p>l Gas  Transmission Company Ltd. mandated for gas production transmission</p>
<p>l  Titas Gas Transmission and Distribution Company Ltd. mandated for gas  distribution</p>
<p>l Bakhrabad Gas Systems Ltd. mandated for gas  distribution</p>
<p>l Jalalabad Gas Transmission &amp; Distribution  System Ltd. mandated for gas distribution</p>
<p>l Paschimanchal Gas  Company Ltd. mandated for gas distribution</p>
<p>l Karnaphuli Gas  Distribution Company Limited (KGDCL) and Sundarban Gas Distribution  Company Limited (SGCL), both are the new companies under formation to  deal with gas distribution.</p>
<p>l Rupantarita Prakritik Gas Company  Ltd. mandated mainly for distribution of CNG, LPG including installation  of CNG refueling station and CNG workshop establishment.</p>
<p>l  Barapukuria Coal Mining Company Ltd. mandated for Coal	mining at  Barapukuria, which started production in September 2005 with the  targeted capacity of 10.00 Iakh metric tons per year. Out of this  targeted production, about 7.00 Iakh metric tons of coal per year will  be used in the Barapukuria thermal power plant (2 x 125 MW) and  remaining 3.00 lakh metric tons of coal will be locally used  particularly by the brickfields,	steel	mills, tea-estate and other  industries.</p>
<p>l Madhapara Granite Mining Company Ltd. mandated for  hardrock/granite mining at Madhapara, which started production in May,  2007 with the targeted capacity of 16.50 lakh metric tons per year  (5,500 tons per day).</p>
<p>Gas reserves of Bangladesh and</p>
<p>its  demand-supply scenario</p>
<p>Presently, Bangladesh is heavily dependent  on fossil fuel i.e. indigenous natural gas but as of recent studies the  country is likely to be unable to sustain so dependency for long due to  limitation of proven gas reserve. As an imperative we have to find the  alternatives. In Bangladesh, natural gas is one of the important sources  of energy that accounts for 75% of the commercial  energy of the country. Till now 23 gas fields have been  discovered in the country. The estimated recoverable proved and probable  (P] + P2) reserve of the 23 gas fields is 21.05 TCF. Out of which, as  of June 2009, a total of 8.37 TCF gas has already been produced and as  such the left over proved and probable (PI + P2) recoverable reserve is  12.68 TCF. The probable (P2) reserve needs to be converted into proved  reserve (PI) through further appraisal/development drilling program for  effective gas based forward planning,</p>
<p>Bangladesh is basically an  energy deficit country. As far as the current gas reserve is concerned,  proved reserve is sufficient up to the year 2011. Thereafter, if  probable reserve could be converted into proved reserve, it is estimated  to be sufficient up to the year 2015. Further to that, if probable and  possible reserves could be converted into proved reserve then it is  assumed to be sufficient up to the year 2019. Even, if the projected  exploration ventures do not yield significant positive results or  existing gas fields fail to prove presently estimated reserve, the  deficit in supply might be felt earlier. Subsequently, the country is  likely to encounter a net deficit in gas supply from its own reserve if  significant gas discovery cannot be made to enhance the existing reserve  base.</p>
<p>Bangladesh would need 20-25 TCF additional gases by 2025  to keep up its GDP growth of 7%. Therefore, Bangladesh may have to think  about import of gas if significant gas discovery cannot be made.  Keeping this in view, the effort of increasing gas reserves has been  continuing at the end of Petrobangla. Since there have been limitations  in the gas reserves and future exploration of gas is always subject to  many conditions, therefore, installation of future gas-fired power  plants deserves dual and/or coal/liquid fuel provisions.</p>
<p>Presently  in the FY2009-1 0 the average daily gas demand is planned to be 2,000  MMCFD and it is expected to increase this daily average gas demand upto  4,500 MMCFD in the FY 2019-20, Therefore, in Bangladesh,	it has	become  extremely important to explore and develop new gas fields to meet the  rapidly increasing demand of gas. To	intensify  exploration activities,  the whole country was divided into 23 acreage blocks in the year 1988  and was opened for	foreign investments.  Through two bidding rounds held in 1993 and 1997, 10 Production Sharing  Contracts (PSCS) were	signed with a number of International	Oil  Companies (IOCs)	for 12 acreage blocks. Out of these, 2 PSCs	have  already expired. Currently 8 PSCs are active in 10 acreage blocks.  Beside this,	offshore area of the country has been divided into 28 new  blocks and an international tender was floated by the Government in  February 2008 to start exploration activities in offshore areas under  Production Sharing Contract. In response seven IOCs have submitted bids  for 15 blocks. At present two IOCs have been selected for PSCs for three  blocks where negotiation is going on.</p>
<p>The People&#8217;s Republic of  Bangladesh has been prioritising the development of indigenous natural  gas resource with the view to achieving its PRSP and MDG goals through  the socio-economic development of the country. At present power and  fertiliser along with some other industries in the country directly or  indirectly depend on this valuable resource. The present government has  also visioned to ensure energy security by the year 2021, where gas as  the primary energy source, would contribute a lot in achieving the  target of this government&#8217;s vision.</p>
<p>LPG, NGL, LNG &amp;  Condensate</p>
<p>With a view of reducing the import of fuel along with  producing pollution-free fuel, an LPG plant was installed at Kailashtila  in Sylhet in the year 1998. In November	2007 another NGL/ Condensate  fractionation plant has been installed and commissioned at the same  premises. Both the plants are producing sulphur and lead free and  environment friendly quality LPG and Motor Spirit (Petrol) and HSD  through 	the pr cessing of NGL and condensate respectively. It is to be  noted that	the capacity of both the plants for processing of NGL and  Condensate are 175 M TNGL and 110 MT Condensate and from which 62 MT  LPG, 270,000 Liter MS and 43,000 LitreHSD can be produced per day. But  due to the shortage	of raw materials 16 MT 	LPG, 102,000 litre MS and  20,000 litre HSD are being produced per day.</p>
<p>Condensate produced  from the gas fields of Sylhet region are being transported to the  Ashugonj. The supplied condensate is stored at Ashugonj storage tank and  then delivered to the ship of BPC for carrying it to the Eastern  Refinery Ltd. for processing. Initially condensate receiving and  delivery quantity was 5-6 million litre per month. Now this quantity has  reached up to 22 -25 million litre.</p>
<p>Vehicle conversion to  Compressed	Natural Gas (CNG) is being carried on and promotion of this  mode of fuel is being encouraged.</p>
<p>Before using CNG, the  uncontrolled emission of motor vehicles especially from two stroke  three-wheeler baby taxis and diesel buses</p>
<p>was a major cause for  air pollution.	in urban areas specially Dhaka City. There was poor  visibility due to air pollution in many areas of Dhaka city. Eye  irritation, respiratory illness, cardio vascular diseases were common  phenomenon to city dwellers.</p>
<p>Natural gas of Bangladesh consists  of typically more than 96 per cent methane and practically contains no  sulfur. By raising the usage of CNG substantial improvement in air  quality is observed in urban areas.</p>
<p>CNG stations are consuming  approximately 67.24 MMCM gas monthly, which is equivalent to more than  8.00 crore litres of petrol. Thereby Government is saving foreign  exchange worth Tk. 7,500 crore per year in fuel import. The numbers	of  CNG	run vehicles are increasing	day by day for the positive initiatives  taken by the Government. The rate of air pollution has been reduced  remarkably due to widespread use of CNG.	 In 2001-2002 the number of CNG  run vehicles were 6,734 and these numberhas reached to 1,64,128 up to  June 2009.</p>
<p>Coal</p>
<p>In Bangladesh, the reserve of coal is  about 2,700 million tones in five coal fields so far discovered, namely  Barapukuria, Khalashpir, Phulbari, Jamalgonj and Dighipara which is  equivalent to about 37 tcf gas. So far, only one field, i.e.  Barapukuria, has been developed under a Chinese supplier&#8217;s credit.  Commercial production of Barapukuria coal mine commenced from 10  September 2005 with the targeted capacity of 1.00 million metric ton per  year, but till now that targeted capacity cannot be achieved due to  some constraint/limitation. During FY 2008-09 a total of 0.86 million  metric ton of coal was extracted from the coal mine. Most of Coal is  being used in 2&#215;125 MW power plant and small portion are being used in  Coal based industries.</p>
<p>By achieving the full-targeted capacity  the coal will be locally used particularly in the brickfields, steel  mills, tea-estate and other industries and will have an impact of  reducing deforestation. It is mentioned here that from inception to June  2009, about 2.40 million Metric ton Coal was produced.</p>
<p>Some  possible areas of co-operation by the ICC members</p>
<p>To keep the  GoB&#8217;s developing efforts in achieving its socio-economic target, both  public and private or joint-venture investment will be encouraged in the  downstream activities in the oil, gas &amp; mineral sector. -There are  some possible areas of co-operation in the oil, gas &amp; mineral sector  of Bangladesh are mentioned below:</p>
<p>l As of the country&#8217;s present  gas transmission network we are yet to construct gas transmission and  distribution pipelines over the remaining 50% areas of the country.  Significant investment in the transmission sector is essential, most  immediately around pigging of the existing pipeline system to improve  throughput and check the quality of the infrastructure, and then  addition of compression to increase the capacity of the system. In total  an investment requirement of US$ 1.3 billion was identified in the  transmission sector over the period of 2025, which was defined in the  Gas Sector Master Plan.</p>
<p>l Bangladesh encourages Direct Foreign  Investment to enhance the industrialisation of the country. After  opening of the Bangabandhu Bridge, gas pipeline network has been  expanded in the western zone and further network will be expanded up to  Rajshahi &amp; Khulna districts by 2011/12 under ADB funded Gas  Transmission &amp; Development Project. Public/private entrepreneurs may  participate to set-up gas-based industries like cement factory,  fertiliser factory, petrochemical complex, etc. in the western &amp;  south-western part of Bangladesh.</p>
<p>In Bangladesh only 10% to 12%  of the total population is enjoying gas facilities for their domestic  use, the remaining 88% to 90% people would have felt their needs for LPG  usage. Presently country&#8217;s LPG demand is estimated at around 0.30  million MT.</p>
<p>Whereas only 10% i.e. 30,000 MT of LPG is being  produced in the public sector and about 20,000 MT is imported by the  private sector. Thus to meet the country&#8217;s present estimated LPG demand,  it needs additional 0.25 million MT of LPG for the country. This LPG  demand is tremendously increasing day-by-day.</p>
<p>Alongside to the  above, industries particularly in the south-eastern part of the country  are still suffering the deficit of their required gas both in the  private and public sectors. Therefore, present and future growing  industries are demanding immediate and earnest need of LNG, and it is  believed to have a promising and profitable international LNG market in  Bangladesh. In view of the above, Private entrepreneurs may initiate to  look for the prospects of businesses and bilateral co-operations in the  energy sector, particularly in regard to the LNG and LPG demand in  Bangladesh. Various international Road Shows have been launched to  attract entrepreneur to invest in the LNG sector. It has a good market  in Bangladesh. An overview with estimated cost &amp; time for possible  LNG marketing in Bangladesh has been furnished below:</p>
<p>LNG FSRU  (on lease/own basis): Fast Track</p>
<p>1. Estimated Time 18 months</p>
<p>2.  Cost depending on ship size for 130k to 200k vessel is USD 80m to USID  120m</p>
<p>3. Cost for double mooring jetty is USID 50m</p>
<p>4. Other  project costs USID I I Om</p>
<p>5. Total project cost USID 280m  (approx.)</p>
<p>For Permanent LNG Terminal (Estimated Time 36 months)</p>
<p>l  Permanent infrastructure for mooring jetty, LNG receiving terminal,  short plant, regasification unit, and necessary send out facilities will  cost about USD 700m to 800m.</p>
<p>l LNG cost for 3.80 to 4.00 Mtpa @  USD7.00 is USID	109m &#8211; 110m (For gas equivalent @500mmscfd)</p>
<p>Coal  deposits of North-Western part of the country may be the best alternate  source of energy. Investors may come up for investment in coal mines	and  coal based industries.</p>
<p>Though Bangladesh has also prospect of  coal bed methane in some of the discovered coal fields, but the country  to achieve modern technology for coal mine as well as extraction of coal  bed methane and as such, it is looking for the international  co-operation for such mining activities. Moreover, possible prospect of  gasification of coal deposits and installation of mine-mouth power  plants deserve to be taken into consideration. Investors may come up for  investment in such coal mines for extraction of gas from coal or set up  a power plant in mine mouth to utilise such gases from coal bed.</p>
<p>(The  writer is Chairman, Petrobangla)</p>
</div>
</div>
<p><a href="http://www.thefinancialexpress-bd.com/more.php?news_id=97578&amp;date=2010-04-13"></a></p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fpetrobangla-and-the-indigenous-natural-gas-and-coal-resources-of-bangladesh%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>The future of energy in the Netherlands and Bangladesh</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fthe-future-of-energy-in-the-netherlands-and-bangladesh%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fthe-future-of-energy-in-the-netherlands-and-bangladesh%2F#comments</comments>
		<pubDate>Tue, 13 Jul 2010 10:03:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[english]]></category>
		<category><![CDATA[bangladesh]]></category>
		<category><![CDATA[bangladesh energy sector]]></category>
		<category><![CDATA[clean energy]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[energy sources]]></category>
		<category><![CDATA[Netherlands]]></category>
		<category><![CDATA[private sector]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2837</guid>
		<description><![CDATA[
The future of energy in the Netherlands and Bangladesh

Alphons J.A.J.M.G. Hennekens
THE Netherlands energy policy is based on the European vision that in 2050 energy should be clean, reliable and affordable. This vision was developed based on the notion that the demand for energy is ever increasing, the associated CO2 emission is too high at the [...]]]></description>
			<content:encoded><![CDATA[<p><strong><br />
The future of energy in the Netherlands and Bangladesh</strong></p>
<p><strong><a href="http://www.bdelink.com/index.php/2010/04/25/petroleum-products-demand-raised-by-five-times/fe-logo-16/" rel="attachment wp-att-2394"><img src="http://www.bdelink.com/wp-content/uploads/2010/04/fe-logo4.bmp" alt="gas wells" title="fe logo" class="alignright size-full wp-image-2394" /></a><br />
Alphons J.A.J.M.G. Hennekens</strong><a href="http://www.thefinancialexpress-bd.com/more.php?news_id=97580"></p>
<p>THE Netherlands energy policy is based on the European vision that in 2050 energy should be clean, reliable and affordable. This vision was developed based on the notion that the demand for energy is ever increasing, the associated CO2 emission is too high at the moment and traditional energy sources are getting scarcer. The Netherlands wants to break the cycle of increasing reliability on polluting energy sources and strives for a transition to sustainable, clean energy management. At the same time it is realised that the Government cannot achieve this on its own and active cooperation and contribution is sought from the private sector, households, knowledge institutes and non-governmental organisations.</p>
<p>Already in 2008, the Government formulated its energy vision, which provides the framework for national and international cooperation in the field of energy. The energy vision is broken down into three priorities:</p>
<p>1. Ensuring that the energy needed to meet the demand is provided in an economically efficient way.</p>
<p>2. Ensuring the right &#8216;energy mix&#8217; needed to meet energy demand in a sustainable way.</p>
<p>3. Ensuring that the proper infrastructure is in place to deliver energy to the customer.</p>
<p>The challenges in the energy sector in the Netherlands cannot be solved within the present energy structure. The Government believes that to achieve the different policy objectives it will be necessary to force technological changes, foster behaviour changes of consumers and to adapt the energy infrastructure in order to make the change to a sustainable energy management possible.</p>
<p>One of the key factors that determine the success of the transition is the role of civil society and the private sector. Both stakeholders will be intimately involved in shaping and implementing the energy policy in the coming years. At the core of sustainable energy management is a system of flexible energy management. This means an energy management system which is:</p>
<p>&#8211; Cleaner, especially in terms of reduction of CO2 emission in order to meet the EU target of 50% in 2050 against the emission level of 1990. The focus will be on energy saving, sustainable energy CO2 Capture and Storage (CCS) and nuclear energy.</p>
<p>&#8211; Smarter, smarter regulation of supply and demand through the use of ICT (smart energy consumption meters and networks). New combinations of techniques and systems are needed both small scale (energy neutral housing) and large scale (integration of electricity grids with neighbouring countries).</p>
<p>&#8211; Diversified, energy should be supplied through a variety of sources, besides sustainable energy sources more variation in fossil fuels is needed originating from multiple countries, through multiple routes.</p>
<p>Vision 2050</p>
<p>The vision the Government of the Netherlands is that by 2050, 40% of all energy originates from sustainable energy sources, this can be achieved by investing in wind at sea, biomass and a variety of small scale decentralised techniques. The percentage of energy from natural gas has decreased and the percentage of energy from coal and nuclear power has increased. In 2050, there will be more import and export of electricity. The Netherlands will still have quite a number of gas powered electricity plants but these will use mainly gas from sustainable sources. There will be an increase in decentralised micro-Combined Heat &#038; Power (micro-CHP) systems, solar power, wind-turbines, and heat pumps. The use of petrol and diesel has reduced drastically as most cars will be powered through electricity, bio-fuels and/or hydrogen. The &#8216;heat demand&#8217; of buildings will have decreased whereas in the industry more sustainable heat is used, which will lead to high energy-saving also as a result of energy supply chain cooperation.</p>
<p>To achieve the vision the Netherlands will:</p>
<p>1. Create a good investment climate for large scale energy production, further integration of electricity markets, streamlining procedures for infrastructure projects, develop a clear framework for Carbon Capture and Storage and develop clear sustainability criteria for the use of biomass.</p>
<p>2. Strengthen the role of the Netherlands as main hub for gas distribution in the world and work on the development of the North-Sea as (sustainable) energy source.</p>
<p>3. Foster innovation to develop small scale techniques and develop the accompanying policies to make the energy grind smarter, flexible and more efficient.</p>
<p>Innovations in energy</p>
<p>Innovation is one of the key elements to achieve the energy vision 2050. The Government has created several policy instruments and platforms to foster innovation and to bring Government, private sector and civil society together around the issue of clean, smart and affordable energy (see www.senternovem.nl/energytransition/index.asp for more information). From its side, the Government will ensure that there is a supporting framework (transparent, efficient markets, tax regulations and policies) which enable innovations to take place. Innovations will focus among others on:</p>
<p>1. New gas: demonstration projects for the production of SNG (synthetic natural gas).</p>
<p>2. Sustainable electricity: further development of solar cells.</p>
<p>3. Sustainable mobility: experiments with hydrogen driven cars.</p>
<p>4. Supply Chain Efficiency: reduction of energy use in agriculture.</p>
<p>5. Urban areas: development and application of heat and cold storage under ground.</p>
<p>6. Blue energy: using the North-Sea as source of energy through wave energy, wind turbines at sea (6000 MW to be generated in the coming years at sea through wind turbines), production of algae as a source of biomass, and making use of the electricity potential difference between salt and fresh water to create electricity.</p>
<p>7. Nuclear energy: development of 4th generation technologies.</p>
<p>To foster innovations in these areas in the Netherlands, the Government has made EUR 458 million available for the period 2008-2012.</p>
<p>Energy in Bangladesh</p>
<p>Energy is at the source of development and to achieve middle income status in the coming years, Bangladesh needs to invest in a stable energy supply and a good energy management system. The same as in the Netherlands, energy must be sustainable, reliable and affordable. On the short term, Bangladesh must identify ways to make more efficient use of the existing natural resources (gas, coal) and upgrade the reliability of the energy network. On the medium term, Bangladesh should ensure a stable sustainable supply of energy through interconnectivity with neighbouring countries. Europe has one fully integrated electricity network which will be connected with the electricity network of Africa, creating one of the largest electricity networks in the world. The main reason for this is to create a stable supply and to accommodate energy supply and demand shocks due to decentralisation of energy generation. Coupled to this investments need to be made to make energy supply more robust. This requires diversification in the sources of energy and investing in a better, more flexible, reliable and stable grid.</p>
<p>To prepare for better energy management in the longer term, Bangladesh must identify and test appropriate energy generation systems and a smarter, regionally interconnected grid and invest in human capacity to be able to construct and manage the new energy system. In order to achieve this, the Government must play an active role in fostering the discussion between the Government, private sector, think tanks, non-governmental stakeholders and consumers. Furthermore, the Government should consider investing in a (regional) energy market and provide a robust framework for investments and innovation in the energy sector.</p>
<p>The writer is Ambassador of the Kingdom of The Netherlands in Bangladesh</p>
<p>http://www.thefinancialexpress-bd.com/more.php?news_id=97580</p>
<p>  </a></p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F13%2Fthe-future-of-energy-in-the-netherlands-and-bangladesh%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Bangladesh power sector: Elusive goals</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F06%2Fbangladesh-power-sector-elusive-goals%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F06%2Fbangladesh-power-sector-elusive-goals%2F#comments</comments>
		<pubDate>Tue, 06 Jul 2010 20:50:25 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[BUSINESS]]></category>
		<category><![CDATA[english]]></category>
		<category><![CDATA[power sector]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2814</guid>
		<description><![CDATA[new nation
EDITORIAL
Power sector: Elusive goals
THE Finance Minister has made it known on Saturday that we to wait till 2012 for a balance between power demand and its supply. It was not long ago that the Minister pledged that power problems would be gone or nearly gone by 2011. Clearly, the extending of the date of [...]]]></description>
			<content:encoded><![CDATA[<p><strong>new nation</strong><br />
EDITORIAL<br />
<strong>Power sector: Elusive goals</strong></p>
<p>THE Finance Minister has made it known on Saturday that we to wait till 2012 for a balance between power demand and its supply. It was not long ago that the Minister pledged that power problems would be gone or nearly gone by 2011. Clearly, the extending of the date of no load shedding to 2012, marks a clear admission that implementation activities in the power sector are hardly going well. Consumers of power were gladdened by the earlier optimism that normalcy in power supply could be attained by 2011; their frustration would be only deepened by the latest disclosure.</p>
<p>The government is engaged in fast-track negotiations to get some rental power plants established to generate some 1200mw of power as early as possible. But the rental plants are no substitutes for a sustainable solution to the power crisis. This can be achieved only by bringing into stream power plants of a regular nature feeding on local supplies of coal and gas. But even the coal policy has not been finalised yet not to speak of the mineral&#8217;s exploitation. In all likelihood, the plans of bringing the big power plants into operation from 2012 onwards, will fizzle out gradually if appropriate policies are not taken and executed well in time for better results.</p>
<p>Meanwhile, many industries have closed down and more seem destined to met a similar fate for the power crisis. Many industries are operating well below capacity. These are undermining industrial productivity and leading to job shedding when the number of the unemployed ones has reached an unprecedented level. Thus, the days are not far off perhaps when discontentment centred on joblessness and no income, would create an explosive situation. The Government must act on a war footing to improve conditions in the power sector.</p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F07%2F06%2Fbangladesh-power-sector-elusive-goals%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Power grid of tomorrow</title>
		<link>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F06%2F30%2Fpower-grid-of-tomorrow%2F</link>
		<comments>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F06%2F30%2Fpower-grid-of-tomorrow%2F#comments</comments>
		<pubDate>Thu, 01 Jul 2010 04:20:30 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[english]]></category>
		<category><![CDATA[bangladesh]]></category>
		<category><![CDATA[Electric]]></category>
		<category><![CDATA[ENERGY ARTICLE]]></category>
		<category><![CDATA[green power]]></category>
		<category><![CDATA[Power grid]]></category>

		<guid isPermaLink="false">http://www.bdelink.com/?p=2790</guid>
		<description><![CDATA[Power grid of tomorrow
S.A.Mansoor

About seventy years back, electric power in our part of the world meant a few light bulbs and fans. Electric iron, air conditioners, microwave oven and refrigerators, the common household articles today, were unheard-of in those days.
Today, thanks to the electric power grid, we take all these for granted. It is when [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Power grid of tomorrow</strong></p>
<p><strong>S.A.Mansoor</strong><br />
<a href="http://www.thefinancialexpress-bd.com/more.php?news_id=104683&#038;date=2010-07-01"><br />
About seventy years back, electric power in our part of the world meant a few light bulbs and fans. Electric iron, air conditioners, microwave oven and refrigerators, the common household articles today, were unheard-of in those days.</p>
<p>Today, thanks to the electric power grid, we take all these for granted. It is when power is not there we come to realise what we miss, and how much we need it, and cannot live without it. However, thanks to another electrical gadgets &#8212; IPS and batteries &#8212; the misery, particularly in hot days, is somewhat contained by instant home back-up power.</p>
<p>In Bangladesh, we are all familiar with the terms &#8216;load shedding&#8217; and also &#8216;power rationing&#8217; like food grain, cooking oils, salt and sugar; which were rationed in the days of the last &#8216;World War&#8217; that ended in mid 1940s.</p>
<p>The power grid, silent and mute, hanging overhead or sometimes lying underground, is providing us instant electricity generated from far away. Here power generation, an electro-mechanical activity, has its own noise, heat, smoke and soot; very much like any industrial factory!</p>
<p>However, the grid of tomorrow will have features for the power users, unthinkable to us now in Bangladesh! These power grids will be able to handle &#8216;alternative power sources&#8217;, which have variations in output, depending on the sun or wind. It will even out these fluctuations of power inputs, with networking interconnection between various centres of power production and the all-spanning grid.</p>
<p>Power grids span continents; and in the coming days the European Grid network will expand to Africa, and tap on to the vast potential of solar energy generation from the Sahara Desert; which could well be world&#8217;s largest sun and wind combined alternative energy green power producing zone! The US power grid, sometimes called as the &#8220;World&#8217;s Biggest Combined Machine&#8221; easily carries around a million megawatt of power.</p>
<p>For power transmission on the grid, high or even ultra-high voltage is a must to contain power losses for the large distances that are involved. </p>
<p>For this we use AC (alternating current); as it can be easily stepped up for transmission and then, subsequently reduced to normal household and industrial power voltage range, as needed at the location where it is to be used, connected locally to the low voltage power supply lines.</p>
<p>However, these days, for transmission of bulk power across very long distances DC (direct current) is sometimes preferred over AC. </p>
<p>We can have power storage. The surplus power produced at late at night and dawn, when lighting and air-conditioning loads usually are lower, can be fed back to the system at the time of maximum demand, from sundown to midnight. </p>
<p>This power storage can be of two main types. These are a) Compressed Air Storage and b) Pumped Hydropower Storage. For compressed air storage, during low demand periods, large air compressors compress and store air in storage tanks. During maximum demand period; the stored compressed air drives turbo-alternators (like steam driven turbine generators) producing the extra power needed. For the storage hydropower set-up, we build an artificial closed cycle hydro power plant. Water from a dedicated reservoir at the ground level, is pumped up to a dedicated water reservoir, set at a higher elevation and stored there when power demand is low. During high power demand periods, water from the reservoir flows though water turbines producing electric power! The exhaust water from the water-turbine flows down to the storage area at the lower level by gravity; to be later pumped up, when power demand is low.</p>
<p>Of the two ideas, the hydo-power option in Bangladesh might not be feasible, because of the two large water reservoirs at both low and higher levels that are needed, which can not be located far away. Also the area needed for this, is much larger, than the other option. The compressed air option is more feasible for us, more so if we have underground air storage tanks so that space requirement is reduced.</p>
<p>However, even with overhead air storage, the space needed is possibly no more than a space of a conventional power plant of today.</p>
<p>Our grid management today, despite computer data recording and its internet transmission, is still people dependent to a large extent. Only advantage is that information of status is easily available, which was earlier totally dependent on our fragile telecommunication system.</p>
<p>Emphasis today is on faster response times than humanly possible. Here automated sensors and sensor related switching and transfer of power in bulk is managed through interactions between inter-related grid systems. This is practically an instantaneous response, automatically based on constant monitoring of load densities and patterns with the time duration limited to a few cycles of alternating current.</p>
<p>Tomorrow&#8217;s grid will control large power centres&#8217; demand trends and the inputs from &#8216;alternative sources&#8217; of &#8216;green power&#8217; that can be very useful for this type of automated grid management.</p>
<p>Grids have not yet been developed to meet the challenges of alternative energy sources on a large scale. The need for a &#8217;smart&#8217; and reactive grid is imperative for large concentration of alternative energy sources, even larger than any conventionally fueled power plants. For us in Bangladesh, we must look into this matter, and keep updated so that hopefully &#8217;smart grids&#8217; are in operation here towards the later part of this century. </p>
<p>(<strong>An engineer, the writer is Technical Adviser of Spectra Group</strong>) </a></p>
]]></content:encoded>
			<wfw:commentRss>http%3A%2F%2Fwww.bdelink.com%2Findex.php%2F2010%2F06%2F30%2Fpower-grid-of-tomorrow%2F/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
